Flood Control and Drainage23J00179

CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KABASALAN RIVER (DOWNSTREAM), BARANGAY BANKER, KABASALAN, ZAMBOANGA SIBUGAY

CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KABASALAN RIVER (DOWNSTREAM), BARANGAY BANKER, KABASALAN, ZAMBOANGA SIBUGAY is a DPWH-tracked public work in Region IX, Region IX. Reported contract value: ₱114,836,133.27. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: ESR CONST AND DEVELOPMENT CORP FORMERLY: ESR CONST. Figures trace to dpwh.

Region IX, Region IX
Region: Region IX

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱114,836,133 · ESR CONSTRUCTION & DEVELOPMENT

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2022-04-29 → 2026-02-27

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Zamboanga Sibugay

Based on the coordinates published with the DPWH record and NOAH file ZamboangaSibugay.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KABASALAN RIVER (DOWNSTREAM), BARANGAY BANKER, KABASALAN, ZAMBOANGA SIBUGAY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2023 GAA. DBM GAA FY2023

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

Confirmed (exact contract ID) · 100%

23J00179

₱114,836,133.27 · ESR CONSTRUCTION & DEVELOPMENT

Contractor

335 projects · ₱24.0B total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF CONCRETE ROAD AND ROAD SLOPE PROTECTION STRUCTURE BALIGUIAN COASTAL ROAD, JUNCTION BALIGUIAN - KAUSWAGAN - MAMAD SECTION, ZAMBOANGA DEL NORTE, 2ND DEO, K2043+170.00 - K2044+410.00, K2044+810.00 - K2046+464.00, NET LENGTH: 5.79 LANE KM/2,8

Region IX, Region IX

2018₱280.6M
Reported complete (DPWH)
No sat.

CONCRETING OF ZAMBOANGA DEL SUR COASTAL ROAD, ZAMBOANGA DEL SUR (2ND DEO), CHAINAGE 0 - CHAINAGE 3008.75; CHAINAGE 6000 - CHAINAGE 7542.78; CHAINAGE 28510 - CHAINAGE 29558.80; CHAINAGE 97 - CHAINAGE 1097; CHAINAGE 940.00 - CHAINAGE 1979.62; CHAINAGE 21157

Region IX, Region IX

2016₱276.1M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF BY-PASS AND DIVERSION ROADS LABANGAN - PAGADIAN CITY - DUMALINAO ZDS BY-PASS ROAD, INCLUDING ROW, ZAMBOANGA DEL SUR

Region IX, Region IX

2018₱215.6M
Reported complete (DPWH)
No sat.

CONCRETING OF ROAD LUUK - PANAMAO - PATIKUL CIRCUMFERENTIAL ROAD, SULU 2ND LD, STA. 5+000.00 - STA. 10+280.00 (NET LENGTH: 5,280.00 LN.M.)

Region IX, Region IX

2016₱202.5M
Reported complete (DPWH)
No sat.

ROAD WIDENING DIPOLOG - SINDANGAN - LILOY ROAD, ZAMBOANGA DEL NORTE 1ST DEO, K1873+862.00 - K1875+233.00, K1875+377.00 - K1877+534.00, K1881+560.00 - K1884+449.95, K1884+449.95 - K1885+210.00, NET LENGTH: 14.36 LANE KM/7,178.00 LN.M./7.178 KM

Region IX, Region IX

2018₱187.1M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF ROAD ALONG NRJ BARANGAY CAMUL - NRJ BARANGAY LUMBAYAO PACKAGE 2, ZAMBOANGA DEL NORTE

Region IX, Region IX

2024₱173.6M
Past target date (DPWH On-Going)
View all 335 projects →

4. Implementation

Contract Amount

₱114,836,133.27

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

April 11, 2023

Target End

December 15, 2023

5. Audit