Construction of Flood Mitigation Structure22IH0057

Construction of San Antonio Shore Protection along San Antonio Circumferential Road, San Antonio, Northern Samar

Construction of San Antonio Shore Protection along San Antonio Circumferential Road, San Antonio, Northern Samar is a DPWH-tracked public work in SAN ANTONIO (NORTHERN SAMAR), NORTHERN SAMAR, Region VIII. Reported contract value: ₱48,473,345.46. Status: Reported complete (DPWH). Contractor on record: CTC BUILDER AND SUPPLIES INC FOR CTC BU / VCD CONST AND SUPPLY. Figures trace to sumbong.

SAN ANTONIO (NORTHERN SAMAR), NORTHERN SAMAR, Region VIII
Region: Region VIII

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2022 · ₱50,000

    Probable match · score 0.88

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-BMB-C-22-0002496 · ₱244,688,407 · release to the district office, not itemized per project

    Possible match · score 0.65

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22IH0057 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-04-04 → 2023-10-06

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of San Antonio Shore Protection along San Antonio Circumferential Road, San Antonio, Northern Samar

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Brgy. Colab-og (Colab-og Bridge), Victoria, Northern Samar
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-C-22-0002496

₱244,688,407.00 · FY2022

Released to Northern Samar 1st District Engineering Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0003182

₱192,636,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROVIII-22-0013001

₱27,584.00 · FY2022

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

1 projects · ₱48.5M total · 0 flags

4. Implementation

Contract Amount

₱48,473,345.46

Progress

Reported complete (DPWH)

Start Date

February 21, 2022

Target End

January 11, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.