Construction of Concrete Revetment/ Dike or Flood Control (Phase1) along the Existing Bridge Connecting Barangay North Lamidan and Barangay South Lamidan, Davao Occidental
Construction of Concrete Revetment/Dike or Flood Control (Phase1) along the Existing Bridge Connecting Barangay North Lamidan and Barangay South Lamidan, Davao Occidental is a DPWH-tracked public work in DON MARCELINO (DAVAO OCCIDENTAL), DAVAO OCCIDENTAL, Region XI. Reported contract value: ₱49,490,002.98. Status: Reported complete (DPWH). Contractor on record: ST MATTHEW GEN CONTRACTOR & DEVELOPMENT CORP. Figures trace to sumbong.