Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: Davao Occidental District Engineering Office awarded 22 of 22 recorded flood-control contracts (100.0%) at 99.5% or more of their Approved Budget for the Contract, versus 70.4% for flood-control contracts nationwide (29.6 percentage points higher; binomial p = 4.4e-04), across 11 contractors. Source: DPWH / Sumbong sa Pangulo contract records; each contract is listed below. This pattern may result from consistently competitive bidding or careful cost estimation by the office.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Davao Occidental District Engineering Office: contracts
22 of 22 contracts (100%) at ≥99.5% of ABC · peer baseline 70.4% · gap +29.6 pts · binomial p = 4.4e-4. Source: DPWH transparency portal and Sumbong sa Pangulo records (linked per contract).
| Contract | Title | Contractor | % of ABC | Source |
|---|---|---|---|---|
| 22LE0031 | Construction of Concrete Revetment, Fatima, Sta. 0+000 - Sta. 2+000, Malita, Davao Occidental | ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP | 100.00% | DPWH |
| 22LE0030 | Construction of Concrete Revetment, Demoloc, Sta. 0+000 - Sta. 2+000, Malita, Davao Occidental | ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP | 100.00% | DPWH |
| 22LE0035 | Construction of Concrete Revetment, Lawa, Sta. 0+000 - Sta. 2+000, Don Marcelino, Davao Occidental | ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP | 100.00% | DPWH |
| 22LE0034 | Construction of Concrete Revetment, Lapuan, Sta. 0+000 - Sta. 2+000, Don Marcelino, Davao Occidental | ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP | 100.00% | DPWH |
| 22LE0032 | Construction of Concrete Revetment, Kilalag, Sta. 0+000 - Sta. 2+000, Malita, Davao Occidental | ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP | 100.00% | DPWH |
| 22LE0029 | Construction of Concrete Revetment, Culaman, Sta. 0+000 - Sta. 2+000, Jose Abad Santos, Davao Occidental | ST TIMOTHY CONST CORP | 100.00% | DPWH |
| 22LE0036 | Construction of Concrete Revetment, Pongpong, Sta. 0+000 - Sta. 2+000, Sta. Maria, Davao Occidental | ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP | 100.00% | DPWH |
| 23LE0034 | Construction of Tubalan Flood Control Structure, Malita, Davao Occidental | LEGACY CONST CORP FORMERLY: LEGACY CONST | 100.00% | DPWH |
| 22LE0028 | Construction of Concrete Revetment, Capisolon Flood Control, Sta. 0+000 - Sta. 2+000, Jose Abad Santos, Davao Occidental | ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP | 100.00% | DPWH |
| 24LE0020 | Construction of Concrete Revetment, Lapuan Flood Control, Don Marcelino, Davao Occidental | SCP CONST | 99.99% | DPWH |
| 22LE0033 | Construction of Concrete Revetment, Kumasie, Sta. 0+000 - Sta. 2+000, Sta. Maria, Davao Occidental | ST MATTHEW GEN CONTRACTOR & DEVELOPMENT CORP | 99.99% | DPWH |
| 23LE0017 | Construction of Concrete Revetment (RC Cut-off Wall), Pangian Flood Control, Malita, Davao Occidental | AMETHYST HORIZON BUILDERS AND GEN CONTRACTOR AND DEVELOPMENT CORP | 99.99% | DPWH |
| 23LE0035 | Construction of Flood Control, Barangay Poblacion, Sta. Maria, Davao Occidental | SCP CONST | 99.99% | DPWH |
| 23LE0056 | Construction of Concrete Revetment Barangay Pinalpalan, Malita, Davao Occidental | YPR GEN CONTRACTOR AND CONST SUPPLY INC | 99.99% | DPWH |
| 23LE0020 | Construction of Concrete Revetment, Lawa Flood Control, Don Marcelino, Davao Occidental | YPR GEN CONTRACTOR AND CONST SUPPLY INC | 99.99% | DPWH |
| 23LE0018 | Construction of Concrete Revetment (RC Cut-off Wall), Pongpong Flood Control, Sta. Maria, Davao Occidental | GREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC | 99.99% | DPWH |
| 22LE0074 | Construction of Concrete Revetment/Dike or Flood Control (Phase1) along the Existing Bridge Connecting Barangay North Lamidan and Barangay South Lamidan, Davao | ST MATTHEW GEN CONTRACTOR & DEVELOPMENT CORP | 99.98% | DPWH |
| 23LE0036 | Construction of Macol Flood Control Structure, Malita, Davao Occidental | LEGACY CONST CORP FORMERLY: LEGACY CONST | 99.97% | DPWH |
| 22LE0042 | Construction of Slope Protection at Brgy. Pangian, Malita, Davao Occidental | FORTSTONE CONST ENT | 99.97% | DPWH |
| 22LE0041 | Construction of Slope Protection at Brgy. Lacaron, Malita, Davao Occidental | FORTSTONE CONST ENT | 99.97% | DPWH |
| 23LE0026 | Construction of Concrete Revetment along Bolila-Bito-Mana Diversion Road, Malita, Davao Occidental | HVC SAGITTARIUS COMMERCIAL & CONST | 99.95% | DPWH |
| 22LE0058 | Construction of Slope Protection Structure at Barangay Pangian, Malita, Davao Occidental | DISEM CONST AND SUPPLY | 99.93% | DPWH |
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
Completion schedule is shown for project and contractor flags only.
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Implementing office awards near-ABC contracts far more often than the flood-control baseline
{
"office": "Davao Occidental District Engineering Office",
"nearAbc": 22,
"trigger": "office_pattern_aggregate",
"officeId": "9ef9141f-0943-57ff-bdb5-f1f7764279fa",
"threshold": 0.995,
"binomialTailP": 0.00044331116729167536,
"nearAbcRatePct": 100,
"totalContracts": 22,
"baselineRatePct": 70.4,
"excessPctPoints": 29.6,
"expectedNearAbc": 15.5,
"baselineDefinition": "share of all Sumbong flood-control contracts awarded at ≥99.5% of ABC"
}Source documents