Construction of Revetment22LE0031

Construction of Concrete Revetment, Fatima, Sta. 0+000 - Sta. 2+000, Malita, Davao Occidental

Construction of Concrete Revetment, Fatima, Sta. 0+000 - Sta. 2+000, Malita, Davao Occidental is a DPWH-tracked public work in MALITA (DAVAO OCCIDENTAL), DAVAO OCCIDENTAL, Region XI. Reported contract value: ₱96,500,000.00. Status: Reported complete (DPWH). Contractor on record: ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP. Figures trace to sumbong.

MALITA (DAVAO OCCIDENTAL), DAVAO OCCIDENTAL, Region XI
Region: Region XI

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2022 · ₱50,000

    Probable match · score 0.87

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROXI-22-0008209 · ₱84,099

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱96,450,021 · ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-07-25 → 2023-03-12

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (revetment)

₱48,250 per linear m= 0.3x the Region XI median (n=93)

Contract cost ₱96,500,000 ÷ 2,000 linear m read from the DPWH title (“Sta. 0+000 - Sta. 2+000”; station range length (Sta. a+b to c+d)). National percentile: 11. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Davao Occidental

Based on the coordinates published with the DPWH record and NOAH file DavaoOccidental.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Concrete Revetment, Fatima, Sta. 0+000 - Sta. 2+000, Malita, Davao Occidental

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 87%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Concrete Revetment/Dike or Flood Control (Phase1) along the Existing Bridge Connecting Barangay North Lamidan and Barangay South Lamidan, Davao Occidental
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXI-22-0008209

₱84,099.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0003155

₱150,000,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROXI-22-0006988

₱73,277.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROXI-22-0005354

₱78,062.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0003042

₱3,000,000.00 · FY2022

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

CID No. 22LE0031 CONSTRUCTION OF CONCRETE REVETMEN

₱96,450,021.15 · ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP

Award / contract ref: 22LE0031

Contractor

B

141 projects · ₱11.1B total · 23 flags

4. Implementation

Contract Amount

₱96,500,000.00

Progress

Reported complete (DPWH)

Start Date

February 24, 2022

Target End

October 2, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XI (Davao Region)Davao OccidentalMalitaKilalag
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.