Flood Control and Drainage16IM0006No coordinates published by DPWH

CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY 94, TACLOBAN CITY

CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY 94, TACLOBAN CITY is a DPWH-tracked public work in Tacloban City DEO, Region VIII. Reported contract value: ₱2,156,216.00. Status: Reported complete (DPWH). Contractor on record: R AGULLO CONST. Figures trace to dpwh.

Tacloban City DEO, Region VIII

DPWH did not publish coordinates for this project. Location estimated from the project title (town level only); satellite images may not show the exact site.

Region: Region VIII

No before/after satellite images: DPWH did not publish coordinates, and the location estimated from the project title is only town level, which is not confident enough to image.

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    SARO SARO-BMB-A-16-0038826 · · release to the district office, not itemized per project

    Possible match · score 0.65

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16IM0006 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY 94, TACLOBAN CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2016 GAA. DBM GAA FY2016

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-16-0038826

₱-3,074,246.00 · FY2016

Released to Davao Orien (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

38 projects · ₱168.3M total · 0 flags

4. Implementation

Contract Amount

₱2,156,216.00

Progress

Reported complete (DPWH)

Start Date

October 9, 2016

Target End

November 22, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.