Flood Control and Drainage15DP0120No coordinates published by DPWH

FLOOD CONTROL PROJECTS BASED ON FLOOD MASTER PLAN FOR METRO MANILA AND SURROUNDING AREAS CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM AND DOWNSTREAM) OF PATAY NA TUBIG BRIDGE, SAN PABLO CITY, LAGUNA 3RD LD

FLOOD CONTROL PROJECTS BASED ON FLOOD MASTER PLAN FOR METRO MANILA AND SURROUNDING AREAS CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM AND DOWNSTREAM) OF PATAY NA TUBIG BRIDGE, SAN PABLO CITY, LAGUNA 3RD LD is a DPWH-tracked public work in Laguna 3rd DEO, Region IV-A. Reported contract value: ₱27,193,469.45. Status: Reported complete (DPWH). Contractor on record: NEWBIG FOUR J CONST INC FORMERLY: FOUR J CONST. Figures trace to dpwh.

Laguna 3rd DEO, Region IV-A

DPWH did not publish coordinates for this project. Location estimated from the project title (town level only); satellite images may not show the exact site.

Region: Region IV-A

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2016 · ₱30,000

    Probable match · score 0.96

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROIX-16-0030618 · ₱655,280 · release to the district office, not itemized per project

    Possible match · score 0.63

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 15DP0120 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: FLOOD CONTROL PROJECTS BASED ON FLOOD MASTER PLAN FOR METRO MANILA AND SURROUNDING AREAS CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM AND DOWNSTREAM) OF PATAY NA TUBIG BRIDGE, SAN PABLO CITY, LAGUNA 3RD LD

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 96%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Flood Control Projects based on Flood Master Plan for Metro Manila and Surrounding Areas - Construction of Flood Control Structure (Upstream and Downstream) of Patay na Tubig Bridge, San Pablo City, Laguna
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROIX-16-0030618

₱655,280.00 · FY2016

Released to Zamboanga Sibugay National High School (Pangi Re (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

352 projects · ₱28.1B total · 0 flags

4. Implementation

Contract Amount

₱27,193,469.45

Progress

Reported complete (DPWH)

Start Date

February 23, 2016

Target End

August 20, 2016

5. Audit