Construction of Flood Mitigation Structure22EB0096

Construction of River Protection Structures along Calawagan River, Sta. 0+000 - Sta. 0+322, Sta. 0+492 - Sta. 0+772.00, Paluan, Occidental Mindoro

Construction of River Protection Structures along Calawagan River, Sta. 0+000 - Sta. 0+322, Sta. 0+492 - Sta. 0+772.00, Paluan, Occidental Mindoro is a DPWH-tracked public work in PALUAN (OCCIDENTAL MINDORO), OCCIDENTAL MINDORO, Region IV-B. Reported contract value: ₱46,100,036.07. Status: Reported complete (DPWH). Contractor on record: HI-TONE CONST & DEVELOPMENT CORP FORMERLY. Figures trace to sumbong.

PALUAN (OCCIDENTAL MINDORO), OCCIDENTAL MINDORO, Region IV-B
Region: Region IV-B

Money Trail

1. Appropriation

Probable match · score 90%

UACS
18001
Amount
₱45,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Anahawin River, Sta. 0+000 - Sta. 0+473, Brgy. Poblacion, Calintaan, Occidental Mindoro
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXI-22-0008209

₱84,099.00 · FY2022

Released to Davao Occidental District Engineering Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0003189

₱505,770,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0003340

₱100,000,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0002741

₱62,500,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0002726

₱20,000,000.00 · FY2022

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

175 projects · ₱17.1B total · 10 flags

Other projects by this contractor

No sat.

DESIGN AND BUILD OF COASTAL DIKE AND DRAINAGE IMPROVEMENT, CATBALOGAN CITY, SAMAR

Flood Control Management Cluster, Central Office

2019₱744.4M
Past target date (DPWH On-Going)
No sat.

LOCAL PROGRAM-NATIONAL BUILDING PROGRAM-BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-CONSTRUCTION OF BICOL REGIONAL HOSPITAL AND MEDICAL CENTER (MEDICAL ARTS BUILDING AND FACILITIES, PATIENT'S ROOM AND TRAINING CENTER), DARAGA, ALBAY, DARAGA,

Region V, Region V

2023₱475.3M
Past target date (DPWH On-Going)
No sat.

LOCAL PROGRAM-NATIONAL BUILDING PROGRAM-BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-CONSTRUCTON 0F BICOL UNIVERSITY CONVENTION AND DISASTER RISK REDUCTION MANAGEMENT CENTER, DARAGA, ALBAY, DARAGA, ALBAY (2ND LEGISLATIVE DISTRICT)

Region V, Region V

2024₱374.4M
Past target date (DPWH On-Going)

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BATO LAKESHORE DIKE ROAD(CIRCUMFERENTIAL ROAD) IN SUPPORT OF AGRIC

Region V, Region V

2023₱279.8M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF COASTAL ROAD AND SHORE P

Region V, Region V

2024₱279.4M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF NBI BUILDING, REGIONAL OFFICE V, REGIONAL GOVERNMENT CENTER, RAWIS, LEGAZPI, ALBAY (2ND LEGISLATIVE DISTRICT)

Region V, Region V

2023₱241.5M
Past target date (DPWH On-Going)
View all 175 projects →

4. Implementation

Contract Amount

₱46,100,036.07

Progress

Reported complete (DPWH)

Start Date

May 30, 2022

Target End

January 30, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.