Roads17RE0006No coordinates published by DPWH

CONSTRUCTION OF ROAD AT BRGY. BUSAY, STA. 0+000 TO STA. 0+220, BAGO CITY, NEG. OCC.

CONSTRUCTION OF ROAD AT BRGY. BUSAY, STA. 0+000 TO STA. 0+220, BAGO CITY, NEG. OCC. is a DPWH-tracked public work in Negros Occidental 4th DEO, Negros Island Region. Reported contract value: ₱1,919,914.29. Status: Reported complete (DPWH). Contractor on record: HUMMING BIRD CONST. Figures trace to dpwh.

Negros Occidental 4th DEO, Negros Island Region

DPWH did not publish coordinates for this project. Location estimated from the project title (barangay level); satellite images may not show the exact site.

Region: Negros Island Region

No before/after satellite images yet: DPWH did not publish coordinates, so imaging is queued for an ESTIMATED location derived from the project title. When processed, images will be labelled as an estimate and may not show the exact site.

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱28,521 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-CAR-17-0012607 · · release to the district office, not itemized per project

    Possible match · score 0.67

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17RE0006 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (new paving / upgrading)

₱8,726,883 per km= 0.5x the Negros Island Region median (n=55)

Contract cost ₱1,919,914 ÷ 0.22 km read from the DPWH title (“STA. 0+000 TO STA. 0+220”; K-post / station range length). National percentile: 11. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF ROAD AT BRGY. BUSAY, STA. 0+000 TO STA. 0+220,  BAGO CITY, NEG. OCC.

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱28,521,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structures along Sibud Creek (Guimaras Strait - Outfall) (Rubble Concrete Gravity - Wall Type), Brgy. Sampinit, Bago City, Negros Occidental
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-CAR-17-0012607

₱-4,999.00 · FY2017

Released to Regional Office - CAR (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱1,919,914.29

Progress

Reported complete (DPWH)

Start Date

April 27, 2017

Target End

June 2, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.