Flood Control and Drainage21CI0026

FLOOD MANAGEMENT PROGRAM; CONST./MAINT./ OF FLOOD CONTROL MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; REHAB OF REINFORCED CONCRETE SLOPE PROTECTION ALONG QUITANGIL CREEK, STA 0+000-STA 1+847, BRGY TURU, MAGALANG,PAMPANGA

FLOOD MANAGEMENT PROGRAM; CONST./MAINT./ OF FLOOD CONTROL MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; REHAB OF REINFORCED CONCRETE SLOPE PROTECTION ALONG QUITANGIL CREEK, STA 0+000-STA 1+847, BRGY TURU, MAGALANG,PAMPANGA is a DPWH-tracked public work in Pampanga 3rd DEO, Region III. Reported contract value: ₱10,288,430.87. Status: Reported complete (DPWH). Contractor on record: WNR CONST AND TRADING. Figures trace to dpwh.

Pampanga 3rd DEO, Region III
Region: Region III

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2021 · ₱15,400 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROIVA-21-0008181 · ₱541,626,000 · release to the district office, not itemized per project

    Possible match · score 0.75

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21CI0026 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-02-23 → 2025-01-24

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Pampanga

Based on the coordinates published with the DPWH record and NOAH file Pampanga.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: FLOOD MANAGEMENT PROGRAM; CONST./MAINT./ OF FLOOD CONTROL MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; REHAB OF REINFORCED CONCRETE SLOPE PROTECTION ALONG QUITANGIL CREEK, STA 0+000-STA 1+847, BRGY TURU, MAGALANG,PAMPANGA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱15,400,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control along Porac River, Jalung, Pampanga
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROIVA-21-0008181

₱541,626,000.00 · FY2021

Released to Batangas 3rd District Engineering Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

53 projects · ₱381.0M total · 0 flags

4. Implementation

Contract Amount

₱10,288,430.87

Progress

Reported complete (DPWH)

Start Date

March 15, 2021

Target End

June 12, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.