Roads20JC0011

PAVING OF UNPAVED ROADS (GRAVEL TO CONCRETE) ALONG LILOY - SIOCON ROAD, K2034+770 - K2035+132, BALIGUIAN, ZAMBOANGA DEL NORTE

PAVING OF UNPAVED ROADS (GRAVEL TO CONCRETE) ALONG LILOY - SIOCON ROAD, K2034+770 - K2035+132, BALIGUIAN, ZAMBOANGA DEL NORTE is a DPWH-tracked public work in Zamboanga del Norte 3rd DEO, Region IX. Reported contract value: ₱11,055,357.09. Status: Reported complete (DPWH). Contractor on record: RUDHIL CONST. Figures trace to dpwh.

Zamboanga del Norte 3rd DEO, Region IX
Region: Region IX

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2020 · ₱25,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20JC0011 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-01-09 → 2019-01-09

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (new paving / upgrading)

₱30,539,660 per km= 1.0x the Region IX median (n=132)

Contract cost ₱11,055,357 ÷ 0.362 km read from the DPWH title (“K2034+770 - K2035+132”; K-post / station range length). National percentile: 59. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: PAVING OF UNPAVED ROADS (GRAVEL TO CONCRETE) ALONG LILOY - SIOCON ROAD, K2034+770 - K2035+132, BALIGUIAN, ZAMBOANGA DEL NORTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱25,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of flood control structure along Dionum Bridge (Piñan-Mutia Road), Dipolog River, Zamboanga del Norte
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Zamboanga del Norte 3rd DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

1,028 projects · ₱22.5B total · 0 flags

4. Implementation

Contract Amount

₱11,055,357.09

Progress

Reported complete (DPWH)

Start Date

December 15, 2020

Target End

February 27, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.