Flood Control and Drainage21FG0045

CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL STRUCTURE ALONG RANGAS RIVER STA.0+027 - STA.0+895.25 MATACLA, GOA, CAMARINES SUR

CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL STRUCTURE ALONG RANGAS RIVER STA.0+027 - STA.0+895.25 MATACLA, GOA, CAMARINES SUR is a DPWH-tracked public work in Camarines Sur 4th DEO, Region V. Reported contract value: ₱84,339,603.88. Status: Reported complete (DPWH). Contractor on record: NFH CONST. Figures trace to dpwh.

Camarines Sur 4th DEO, Region V
Region: Region V

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2021 · ₱14,118

    Probable match · score 0.89

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21FG0045 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-06-03 → 2022-06-03

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (flood control structure)

₱97,137 per linear m= 0.7x the Region V median (n=61)

Contract cost ₱84,339,604 ÷ 868.25 linear m read from the DPWH title (“STA.0+027 - STA.0+895.25”; station range length (Sta. a+b to c+d)). National percentile: 38. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Camarines Sur

Based on the coordinates published with the DPWH record and NOAH file CamarinesSur.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL STRUCTURE ALONG RANGAS RIVER STA.0+027 - STA.0+895.25 MATACLA, GOA, CAMARINES SUR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 89%

UACS
18001
Amount
₱14,118,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction/Improvement of Rangas River Flood Mitigation Structures, Goa, Camarines Sur
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Camarines Sur 4th DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

123 projects · ₱5.3B total · 0 flags

Other projects by this contractor

No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BYPASS AND DIVERSION ROADS-MABOLO-ALMEDA BYPASS ROAD, NAGA CITY, CAMARINES SUR 3RD LEGISLATIVE DISTRICT

Region V, Region V

2021₱226.8M
Reported complete (DPWH)
No sat.

CONST./IMPV'T. OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS - JCT. MORNING, CATAINGAN-ESPERANZA PORT ROAD, PIO V. CORPUZ AND ESPERANZA, MASBATE 3RD LD

Region V, Region V

2016₱202.4M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-CAMARINES SUR EXPRESSWAY PACKAGE 7, CAMARINES SUR, PILI, CAMARINES SUR (3RD LEGISLATIVE DISTRICT)

Region V, Region V

2023₱193.0M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-SECONDARY ROADS -NASUGBU-LIAN-CALATAGAN RD (S05012LZ) - K0113 + 600 - K0114 + 000, K0115 + 000 - K0116 + 400

Batangas 1st DEO, Region IV-A

2024₱144.8M
Reported complete (DPWH)
No sat.

CONST./IMPV'T. OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, ROAD UPGRADING (GRAVEL TO CONCRETE) OF SAN JUAN-ALAS-TAGPU-DAYAO ROAD LEADING TO MANDAON ECOTOURISM SITES, MANDAON, MASBATE PROVINCE

Region V, Region V

2016₱144.7M
Reported complete (DPWH)
No sat.

ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) STA. ELENA - CAPALONGA BY PASS COASTAL ROAD, KO283+040 - KO292+200 WITH EXCEPTIONS, CAMARINES NORTE

Region V, Region V

2016₱142.9M
Reported complete (DPWH)
View all 123 projects →

4. Implementation

Contract Amount

₱84,339,603.88

Progress

Reported complete (DPWH)

Start Date

March 11, 2021

Target End

January 22, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.