Roads21FI0011

NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/NEW ROADS - ASID - TIGBAO - BARA - MALBUG ROAD, MASBATE, STA. 47+360 - STA. 49+110, NET LENGTH = 3.500 LANE KM (1.750 KM), MILAGROS, MASBATE

NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/NEW ROADS - ASID - TIGBAO - BARA - MALBUG ROAD, MASBATE, STA. 47+360 - STA. 49+110, NET LENGTH = 3.500 LANE KM (1.750 KM), MILAGROS, MASBATE is a DPWH-tracked public work in Masbate 2nd DEO, Region V. Reported contract value: ₱96,499,817.32. Status: Reported complete (DPWH). Contractor on record: YAKAL CONST. Figures trace to dpwh.

Masbate 2nd DEO, Region V
Region: Region V

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2021 · ₱30,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱92,749,273 · YAKAL CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-05-27 → 2025-06-22

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (new paving / upgrading)

₱55,142,753 per km= 2.5x the Region V median (n=151)

Contract cost ₱96,499,817 ÷ 1.75 km read from the DPWH title (“STA. 47+360 - STA. 49+110”; K-post / station range length). National percentile: 89. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/NEW ROADS - ASID - TIGBAO - BARA - MALBUG ROAD, MASBATE, STA. 47+360 - STA. 49+110, NET LENGTH = 3.500 LANE KM (1.750 KM), MILAGROS, MASBATE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Mitigation Facilities along Manulib River, Milagros, Masbate
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Masbate 2nd DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

21FI0011

₱92,749,273.42 · YAKAL CONSTRUCTION

Award / contract ref: 21FI0011

Contractor

C

59 projects · ₱4.1B total · 0 flags

Other projects by this contractor

No sat.

ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - JCT. MILAGROS - BALENO - LAGTA RD. (S00016MT) - K0025+(-115) - K0030+140, MILAGROS, MASBATE

Masbate 2nd DEO, Region V

2022₱285.0M
Reported complete (100% progress, DPWH status On-Going)
No sat.

ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - JCT. MILAGROS - BALENO - LAGTA RD. (S00016MT) - K0042+682 - K0045+725, MANDAON, MASBATE

Masbate 2nd DEO, Region V

2022₱172.7M
Past target date (DPWH On-Going)
No sat.

OO1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM (MFO-1)NATIONAL DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROADS, ASID-TIGBAO-BARA-MALBUG ROAD, INCLUDING ROW, MASBATE PROVINCE

Region V, Region V

2018₱172.6M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - JCT. TAWAD - BALUD RD. (S00023MT) - K0028+(-360) - K0028+944, K0029+910 - K0031+930, MILAGROS, MASBATE

Masbate 2nd DEO, Region V

2022₱158.2M
Past target date (DPWH On-Going)
No sat.

WIDENING ALONG BILIRAN CIR. ROAD, K1010+490-K1011+488; K1024+034-K1025+202; K1057+200-K1058+912; K1057+200-K1058+912; K1064+000-K1064+716; K1066+162-K1066+162-K1067+000; K1108+609, BILIRAN, NAVAL, KAWAYAN, CULABA & CABUCGAYAN, BILIRAN LONE DISTRICT ...,

Biliran DEO, Region VIII

2017₱156.2M
Reported complete (DPWH)
No sat.

ROAD WIDENING OF NAVAL - CAIBIRAN CROSS COUNTRY ROAD- K1027+890-K1028+210, K1028+268-K1028+770, K1033+738-K1033+980, K1033+1020-K1034+700, K1036+000-K1036+530, K1036+570-K1037+190, K1037+192-K1037+708, K1044+483.5-K1045+536, BILIRAN DISTRICT

Region VIII, Region VIII

2018₱140.1M
Past target date (DPWH On-Going)
View all 59 projects →

4. Implementation

Contract Amount

₱96,499,817.32

Progress

Reported complete (DPWH)

Start Date

February 14, 2021

Target End

January 25, 2023

5. Audit