CONSTRUCTION OF IRAAN RIVER FLOOD CONTROL STRUCTURE, RIZAL, PALAWAN
CONSTRUCTION OF IRAAN RIVER FLOOD CONTROL STRUCTURE, RIZAL, PALAWAN is a DPWH-tracked public work in Palawan 2nd DEO, Region IV-B. Reported contract value: ₱39,606,019.65. Status: Reported complete (DPWH). Contractor on record: C T LEONCIO CONST. Figures trace to dpwh.
Total Contract Cost
