DPWH projects in Palawan
3,232 DPWH public works projects are recorded in Palawan (Region Iv-B), with start dates from 2016 to 2025. Recorded contract values total about ₱45,242,990,947.37. 2,953 are recorded at 100% progress and 187 are flood control works. Figures are as recorded by DPWH; they are not findings.
Largest recorded projects
- Construction of Flood Control Structure Along Iraan River Upstream, Barangay Iraan, Aborlan, Palawan₱212,295,699.40
- Construction of River Bank Protection Structure Along Irawan River Upstream, Barangay Irawan, Puerto Princesa City, Palawan₱194,927,222.80
- Construction of Riverbank Protection Structures - Ransang River (Both Sides) With Steel Piles, Rizal, Palawan₱192,997,879.70
- Construction of River Bank Protection Works Along Bulalacao River, Bataraza, Palawan₱192,997,857.40
- Construction of Cabuluan River Flood Structure, Barangay Calategas, Narra, Palawan₱192,997,354.30
- Construction of River Bank Protection Works Along Culandanum River, Bataraza, Palawan₱192,997,113.10
- Construction of Road Dike/Esplanade Along Tigaplan River, Barangay Pangobilian, Brooke'S Point, Palawan₱192,991,970.00
- Construction of Aborlan River Waterway, (Downstream Leftside) Aborlan, Palawan₱154,398,410.80
- Construction of Tanabag River Waterway, (Upstream Rightside), Palawan₱154,395,357.90
- Widening of Permanent Bridges Macagua Br. (B00322pw) Along Ppsr, Brooke'S Point, Palawan₱142,577,450.04
- Package-Construction/Concreting of Roads:1. Concreting of Road-Abongan Alacalian Leading to Binga Long Beach2. Construction of Abongan-Alacalian Road, Taytay, Palawan₱132,707,756.40
- Construction of Flood Mitigation Structure (Seawall), Calategas, Narra, Palawan₱120,624,562.10
- Construction of Aborlan River Waterway, Puerto Princesa South Road, Aborlan, Palawan₱120,268,876.00
- Preventive Maintenance - Puerto Princesa North Rd, K0003+(-184) - K0004+371, Puerto Princesa City₱120,162,448.24
- Road Widening of Puerto Princesa North Rd, K0174+174.00-K0174+928.00, K0175+047.00 - K0175+596.00, K0175+756.00-K0176+140.00, K0176+320.00 - K0176+714.00, Taytay, Palawan₱119,180,034.44
- Widening of Permanent Bridges Batang-Batang Br. (B00035pw) Along Puerto Princesa South Rd., Narra, Palawan₱116,989,521.45
- Cluster 7: Const./Improvement of Access Roads Leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program-Roll-It), 7.1. Sta. 00+000-Sta. 01+190; 7.2. Section 1: 00+000-00+626; Section 2: 00+00₱116,034,204.76
- Replacement of Permanent Weak Bridge - Concepcion Br. (B00101pw) Along Puerto Princesa North Road, K0066+678.10, Puerto Princesa City₱115,799,983.24
- Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Puerto Princesa South Rd, K0001+402 - K0002+737, Puerto Princesa City₱115,742,040.04
- Preventive Maintenance of Road: Asphalt Overlay - Puerto Princesa South Rd, K0005+000 - K0007+081, Puerto Princesa City₱114,598,574.51
- Access Road Leading to Mangingisda Seaport, 00+000.00 - 00+900.70, 00+920.47 - 03+498.98, 04+784.92 - 04+938, Barangay Mangingisda, Puerto Princesa City₱106,789,790.90
- Cluster 1: Const. of Road With Drainage System in Puerto Princesa City, Palawan, 1.1: Const. of Road With Drainage Leading to San Jose New Market, Sta. 0+000-Sta. 0+766.15; 1.2: Const. of Road With Drainage System, Brgy. San Miguel, Sta. 0+000-Sta. 1+540,₱105,239,246.98
- Construction of Road, Aporawan to Sitio Daan, 00+000.00 - 02+098.00, Aborlan, Palawan₱103,449,437.00
- Construction of Road, 0+000.00 - 1+240.00, Barangay Bacungan, Puerto Princesa City, Palawan₱99,295,000.00
- Construction of Flood Control Structure Along Iraan River Upstream, Brgy. Iraan (L/S), Aborlan, Palawan₱98,999,956.57