Construction of Flood Mitigation Structure23E00187

Construction of Flood Control Structure along Iraan River Upstream, Barangay Iraan, Aborlan, Palawan

Construction of Flood Control Structure along Iraan River Upstream, Barangay Iraan, Aborlan, Palawan is a DPWH-tracked public work in ABORLAN (PALAWAN), PALAWAN, Region IV-B. Reported contract value: ₱212,295,699.40. Status: Reported complete (DPWH). Contractor on record: YURICH BUILDERS AND CONST SUPPLY INC. Figures trace to sumbong.

ABORLAN (PALAWAN), PALAWAN, Region IV-B
Region: Region IV-B

Money Trail

1. Appropriation

Probable match · score 90%

UACS
18001
Amount
₱25,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Ransang River Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 300 R/S Upstream, Barangay Ransang, Rizal, Palawan
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Palawan 3rd District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

158 projects · ₱6.0B total · 1 flags

Other projects by this contractor

No sat.

CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ABORLAN RIVER WATERWAY, PTO. PRINCESA SOUTH ROAD, UPSTREAM LEFTSIDE, ABORLAN, PALAWAN

Region IV-B, Region IV-B

2025₱229.9M
Past target date (DPWH On-Going)
No sat.

CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ABORLAN RIVER WATERWAY, PTO. PRINCESA SOUTH ROAD, DOWNSTREAM RIGHTSIDE, ABORLAN, PALAWAN

Region IV-B, Region IV-B

2025₱229.9M
Past target date (DPWH On-Going)

Construction of River Bank Protection Structures along Irawan River Downstream (R/S), Barangay Irawan, Puerto Princesa City, Palawan

NAUJAN (ORIENTAL MINDORO), ORIENTAL MINDORO, Region IV-B

2023₱212.3M
Reported complete (DPWH)

Construction of River Bank Protection Structure along Irawan River Upstream, Barangay Irawan, Puerto Princesa City, Palawan

PUERTO PRINCESA CITY (CAPITAL) (PALAWAN), PALAWAN, Region IV-B

2024₱194.9M
Reported complete (DPWH)

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITUIES- CONST. OF PUNANG RIVER FLOOD CONTROL STRUCTURE, SOFRONIO, ESPANOLA, PALAWAN

Region IV-B, Region IV-B

2024₱193.0M
Reported complete (DPWH)

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONSTRUCTION OF MARABAHAY SHORE PROTECTION STRUCTURE/CAUSEWAY, BATARAZA, PALAWAN

Region IV-B, Region IV-B

2023₱193.0M
Reported complete (DPWH)
View all 158 projects →

4. Implementation

Contract Amount

₱212,295,699.40

Progress

Reported complete (DPWH)

Start Date

April 13, 2023

Target End

April 6, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.