Construction of Flood Control Structure along Iraan River Upstream, Barangay Iraan, Aborlan, Palawan
Construction of Flood Control Structure along Iraan River Upstream, Barangay Iraan, Aborlan, Palawan is a DPWH-tracked public work in ABORLAN (PALAWAN), PALAWAN, Region IV-B. Reported contract value: ₱212,295,699.40. Status: Reported complete (DPWH). Contractor on record: YURICH BUILDERS AND CONST SUPPLY INC. Figures trace to sumbong.
Total Contract Cost




