T N RAMOS CONST is listed as a company organization in Philippine public procurement records on this site, with 45 linked DPWH project(s) totaling about ₱2,382,878,540.87. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
T N RAMOS CONST
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 45
- Total value
- ₱2,382,878,540.87
- Published flags
- 0
- Region
- Palawan 1st DEO · Region IV-B
Online presence
Google Maps: T.N. Ramos Construction and Development CorporationGoogle Maps, 2026-10-22
RP97+HC, Puerto Princesa City, Palawan
Public Record Grade
A transparent, data-derived summary of reported public records for T N RAMOS CONST — not an accusation or finding of wrongdoing.
Score: 73.20 / 100 · Projects in sample: 45 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 53.9/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 53.9
- lateCompletedProjects
- 3
- onTimeCompletedProjects
- 26
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 40
- pastTargetOngoingProjects
- 11
- undatedCompletedProjectsExcluded
- 4
- Termination rate
Component score: 93.3/100 · Weight: 24%
- totalProjects
- 45
- componentScore
- 93.3
- terminatedProjects
- 1
- terminationRatePct
- 2.2
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 44
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 45
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 45
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
45 geotagged projects — Open full map · Download projects (CSV)
- BASIC INFRASTRUCTURE PROGRAM ( BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MARINDUQUE CONVENTION CENTER, CAPITOL COMPOUND, BRGY. BANGBANGALON, BOAC, MARINDUQUE (PHASE 2)25EA0020 · ₱127,928,280.30 · mapped
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECONDARY ROADS, ARAMAYWAN-BERONG-PTO. PRINCESA ROAD, K0098+750-K0098+809; K0098+980-K0101+543, QUEZON, PALAWAN25E00128 · ₱125,684,379.97 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - PUERTO PRINCESA SOUTH RD, K0005+000 - K0007+081, PUERTO PRINCESA CITY24EG0015 · ₱114,598,574.51 · mapped
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECONDARY ROADS- MARINDUQUE CIRCUMFERENTIAL ROAD, K027+112-K027+786; K028+930-K030+651, MARINDUQUE25E00001 · ₱111,744,647.19 · mapped
- ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-SECONDARY ROADS, PUERTO PRINCESA SOUTH ROAD, K0105+832-K0106+665, NARRA, PALAWAN25E00127 · ₱108,962,928.09 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS, MOGPOG-BALANACAN PORT RD - K0008 + (-147) - K0009 + 000, K0009 + 585 - K0010 + 22825EA0077 · ₱100,991,570.57 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONST. OF MULTI-PURPOSE BUILDING (PHASE IV), BRGY. POBLACION, TORRIJOS, MARINDUQUE22E00066 · ₱99,000,000.00 · mapped
- REHABILITATION/IMPROVEMENT (ASPHALT OVERLAY) ALONG QUEZON-PUNTA BAJA & PCR (RIZAL-PANALINGAAN SECTION) K0196+976-K0197+352, K0201+377-K0202+500, K0204+770-K0208+100, PALAWAN19EF0156 · ₱96,479,819.14 · mapped
- REHABILITATION OF MARINDUQUE CONVENTION CENTER, CAPITOL COMPOUND, BRGY. BANGBANGALON, BOAC, MARINDUQUE24EA0077 · ₱95,349,630.83 · mapped
- PREVENTIVE MAINTENANCE (ASPHALT OVERLAY) ALONG PUERTO PRINCESA NORTH ROAD, K0263+000 - K0264+975, EL NIDO, PALAWAN25EE0065 · ₱82,285,148.09 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS, MARINDUQUE CIRCUMFERENTIAL RD - K0000+000 - K0001+000, K0003+264 - K0004+000, K0027+786-K0028+93024EA0038 · ₱80,656,869.68 · mapped
- NATIONAL BUILDING PROGRAM- MULYIPURPOSE/FACILITIES- CONST. (COMPLETION) OF BUILDING OF PRESIDENTIAL MANAGEMENT STAFF (PMS)-OFFICE OF THE PRESIDENT (OP) INTEGRATED OPERATIONS & SERVICE CONTINUITY (IOSC) IN BRGY. MONICA, PTO. PRINCESA CITY, PALAWAN24E00088 · ₱76,000,000.00 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS, MARINDUQUE CIRCUMFERENTIAL RD - K0037+687 - K0039+00024EA0039 · ₱74,989,619.04 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIP[AG)- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, PHASE 5, BRGY. POBLACION, TORRIJOS, MARINDUQUE23E00133 · ₱74,784,351.02 · mapped
- ROAD WIDENING - SECONDARY ROADS - ROXAS DIVERSION ROAD, KO137+(-709) - KO137+268, ROXAS, PALAWAN23E00052 · ₱68,523,392.97 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - PUERTO PRINCESA SOUTH RD - K0000+000 - K0001+373, PUERTO PRINCESA CITY24EG0005 · ₱58,971,123.12 · mapped
- CONSTRUCTION OF DPWH PALAWAN 3RD DEO ANNEX BUILDING, PUERTO PRINCESA CITY, PALAWAN23EG0037 · ₱57,900,000.00 · mapped
- REHABILITATION/IMPROVEMENT (ASPHALT OVERLAY) JCT. PAGLAUM-BATO ROAD, K0187+(-691)-K0189+138, K0195+361-K0197+059, K0200+827-K0201+000 TAYTAY, PALAWAN19EE0144 · ₱57,878,207.49 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS, MOGPOG - BALANACAN PORT RD - K0013+000 - K0013+168, K0013+642 - K0014+203, K0014+317 - K0015+33524EA0040 · ₱56,915,431.17 · mapped
- PREVENTIVE MAINTENANCE (ASPHALT OVERLAY) - PPNR JCT. - TAYTAY POBLACION ROAD, K0208+116 - K0209+579, TAYTAY, PALAWAN25EE0064 · ₱53,810,522.01 · mapped
- PREVENTIVE MAINTENANCE (ASPHALT OVERLAY)-SECONDARY ROADS ALONG PUERTO PRINCESA NORTH ROAD, K0199+000 - K0200+435 TAYTAY, PALAWAN24EE0147 · ₱50,391,165.52 · mapped
- PREVENTIVE MAINTENANCE (ASPHALT OVERLAY) ALONG PUERTO PRINCESA NORTH ROAD, K0211+(-700)-K0211+786 TAYTAY, PALAWAN23EE0071 · ₱48,776,882.52 · mapped
- CONSTRUCTION OF BUILDING OF PRESIDENTIAL MANAGEMENT STAFF (PMS)-OFFICE OF THE PRESIDENT (OP) INTEGRATED OPERATIONS AND SERVICES CONTINUITY (IOSC) IN BARANGAY STA. MONICA, PUERTO PRINCESA CITY, PALAWAN21E00023 · ₱48,249,903.98 · mapped
- PREVENTIVE MAINTENANCE (ASPHALT OVERLAY) SECONDARY ROADS ALONG ROXAS DIVERSION ROAD, K0134+(-711) - K0134+264, ROXAS, PALAWAN25EE0063 · ₱41,097,483.29 · mapped
- PACKAGE III-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS:1. CONSTRUCTION OF ROAD, ZONE IV. BRGY. ITANGIL, DUMARAN2. CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD FROM NATIONAL HIGHWAY LEADING TO DULI BEACH, EL NIDO3. CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LE24EE0128 · ₱39,190,223.22 · mapped
- PREVENTIVE MAINTENANCE (ASPHALT OVERLAY) ALONG PUERTO PRINCESA NORTH ROAD, K0082+(-216)-K0082+735 ROXAS, PALAWAN23EE0070 · ₱35,253,090.89 · mapped
- PREVENTIVE MAINTENANCE (ASPHALT OVERLAY) SECONDARY ROADS ALONG PUERTO PRINCESA NORTH ROAD, K0115+063 - K0115+905, ROXAS, PALAWAN25EE0062 · ₱34,422,008.98 · mapped
- VIILP- CONSTRUCTION OF BUILDING OF PRESIDENTIAL MANAGEMENT STAFF (PMS)-OFFICE OF THE PRESIDENT (OP) INTEGRATED OPERATIONS AND SERVICE CONTINUITY (IOSC) PHASE II, BRGY. SANTA MONICA, PUERTO PRINCESA, PALAWAN21E00068 · ₱33,774,192.01 · mapped
- CONSTRUCTION OF BUILDING OF PRESIDENTIAL MANAGEMENT STAFF (PMS)- OFFICE OF THE PRESIDENT (OP) INTEGRATED OPERATIONS AND SERVICE CONTINUITY (IOSC) IN BRGY. STA. MONICA, PHASE IV, PTO. PRINCESA CITY, PALAWAN23E00100 · ₱33,497,456.07 · mapped
- CONSTRUCTION OF MANDAMUS OFFICE21O00138 · ₱30,720,247.09 · mapped
- CONSTRUCTION OF BUILDING OF PRESIDENTIAL MANAGEMENT STAFF (PMS) - OFFICE OF THE PRESIDENT (OP) INTEGRATED OPERATIONS AND SERVICE CONTINUITY (IOSC), BRGY. STA. MONICA, PUERTO PRINCESA CITY, PALAWAN22E00049 · ₱28,948,061.34 · mapped
- ROAD WIDENING ALONG CALAMBA-STA. CRUZ-FAMY JCT. ROAD (S06099LZ), K0105 + 894 TO K0106 + 464, PAKIL, LAGUNA20DH0008 · ₱27,595,330.16 · mapped
- CONSTRUCTION (COMPLETION) OF DPWH PALAWAN 3RD DEO ANNEX BUILDING, PUERTO PRINCESA CITY, PALAWAN24EG0070 · ₱24,500,000.00 · mapped
- PREVENTIVE MAINTENANCE (ASPHALT OVERLAY) ALONG ROXAS DIVERSION ROAD, K0138+ (-385)- K0138+300 ROXAS, PALAWAN23EE0069 · ₱22,464,506.54 · mapped
- PREVENTIVE MAINTENANCE (ASPHALT OVERLAY) ALONG PUERTO PRINCESA NORTH ROAD, K0113+000-K0113+332 ROXAS, PALAWAN23EE0076 · ₱22,151,563.19 · mapped
- ROAD WIDENING ALONG MAJAYJAY-LUCBAN ROAD (S01679LZ), K0121 + 810 TO K0122 + 259, MAJAYJAY, LAGUNA20DH0010 · ₱17,922,134.45 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - PUERTO PRINCESA SOUTH RD - K0015+807 - K0015+994, PUERTO PRINCESA CITY, PALAWAN24EG0064 · ₱17,369,999.75 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - PUERTO PRINCESA SOUTH RD - K0016+650 - K0016+837, PUERTO PRINCESA CITY, PALAWAN24EG0068 · ₱17,369,976.36 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - PUERTO PRINCESA SOUTH RD - K0023+760 - K0023+947, PUERTO PRINCESA CITY, PALAWAN24EG0069 · ₱17,369,921.79 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - PUERTO PRINCESA SOUTH RD - K0016+200 - K0016+385, PUERTO PRINCESA CITY, PALAWAN24EG0066 · ₱17,369,901.41 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - PUERTO PRINCESA SOUTH RD - K0016+000 - K0016+187, PUERTO PRINCESA CITY, PALAWAN24EG0065 · ₱17,369,815.57 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - PUERTO PRINCESA SOUTH RD - K0016+400 - K0016+ 586, PUERTO PRINCESA CITY, PALAWAN24EG0067 · ₱17,369,569.62 · mapped
- PREVENTIVE MAINTENANCE ALONG KALAYAAN POBLACION ROAD CHAINAGE 000, CHAINAGE 304, CHAINAGE 311-CHAINAGE 889, KALAYAAN, LAGUNA20DH0012 · ₱11,400,414.95 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, COUNTER INTELLIGENCE GROUP, HQ NAVAL INTELLIGENCE AND SECURITY FORCE, BONIFACIO NAVAL STATION, NAVAL STATION JOSE FRANCISCO, FORT BONIFACIO TAGUIG CITY19OB0394 · ₱4,850,196.98 · mapped
- REHABILITATION OF THE DAMAGE DRAINAGE CANAL PAS-NGAW ALONG THE MAIN IRRIGATION CANAL AT ZONE 6, BRGY. CALEPAAN, ASINGAN, PANGASINAN19AI0272 · ₱0.00 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →