CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAGAMUSING RIVER, BRGY. STA. MARIA, BINALONAN, PANGASINAN (PACKAGE 5)
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAGAMUSING RIVER, BRGY. STA. MARIA, BINALONAN, PANGASINAN (PACKAGE 5) is a DPWH-tracked public work in Pangasinan 3rd DEO, Region I. Reported contract value: ₱38,389,036.24. Status: Reported complete (DPWH). Contractor on record: AMP 723 CONST CORP FORMERLY: A M P CONST. Figures trace to dpwh.
Total Contract Cost

