Buildings and Facilities18BH0088

CONSTRUCTION OF ONE-STOREY (2 CLASSROOM)

CONSTRUCTION OF ONE-STOREY (2 CLASSROOM) is a DPWH-tracked public work in Isabela 4th DEO, Region II. Reported contract value: ₱2,622,000.00. Status: Reported complete (DPWH). Contractor on record: JC PALOMO CONST. Figures trace to dpwh.

Isabela 4th DEO, Region II
Region: Region II

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROXI-18-0015413 · ₱316,938 · release to the district office, not itemized per project

    Possible match · score 0.75

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18BH0088 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-03-31 → 2025-06-02

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · School building, cost per classroom (new school building)

₱1,311,000 per classroom= 1.0x the Region II median (n=370)

Contract cost ₱2,622,000 ÷ 2 classroom read from the DPWH title (“(2 CLASSROOM”; classroom count in title). National percentile: 24. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF ONE-STOREY (2 CLASSROOM)

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Dinapigue Air Strip, Dinapigue, Isabela
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROXI-18-0015413

₱316,938.00 · FY2018

Released to Division of Davao Oriental (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

95 projects · ₱2.5B total · 0 flags

Other projects by this contractor

No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TUGUEGARAO WEST DIVERSION ROAD (JCT. CARIG-LINAO-ATULUYANBAGAY-BUNTUN), PACKAGE 1, CAGAYAN

Region II, Region II

2024₱149.4M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF MISSING LINKS/NEW ROADS: SAN JOSE-QUIBAL ROAD, PACKAGE 1, CAGAYAN

Region II, Region II

2022₱115.0M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS -TUGUEGARAO WEST DIVERSION ROAD (JCT. CARIG - LINAO - ATULAYAN - BAGAY - BUNTUN), PACKAGE 1, CAGAYAN

Region II, Region II

2023₱106.1M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS -TUGUEGARAO WEST DIVERSION ROAD (JCT. CARIG - LINAO - ATULAYAN - BAGAY - BUNTUN), PACKAGE 3, CAGAYAN

Region II, Region II

2023₱100.4M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF MISSING LINKS/NEW ROADS: SAN JOSE-QUIBAL ROAD, PACKAGE 2, CAGAYAN

Region II, Region II

2022₱100.0M
Reported complete (100% progress, DPWH status On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - SAMPAGUITA-WARAT-LA SUERTE-CATARAUAN-AFUSING RD PHASE III

Cagayan 3rd DEO, Region II

2024₱96.4M
Past target date (DPWH On-Going)
View all 95 projects →

4. Implementation

Contract Amount

₱2,622,000.00

Progress

Reported complete (DPWH)

Start Date

July 16, 2018

Target End

October 21, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)IsabelaCity of SantiagoBatal
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.