MFO2-FLOOD MANAGEMENT SERVICES-CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-REPAIR AND REHABILITATION OF FLOOD CONTROL ALONG TUPAS ST. SITIO IBABA BRGY. SAN PEDRO (STA.1+650-STA.3+000) MORONG RIZAL 2ND LD
MFO2-FLOOD MANAGEMENT SERVICES-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-REPAIR AND REHABILITATION OF FLOOD CONTROL ALONG TUPAS ST. SITIO IBABA BRGY. SAN PEDRO (STA.1+650-STA.3+000) MORONG RIZAL 2ND LD is a DPWH-tracked public work in Rizal 2nd DEO, Region IV-A. Reported contract value: ₱45,711,787.85. Status: Reported complete (DPWH). Contractor on record: ST GERRARD CONST GEN CONTRACTOR. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
