Roads22BC0129

CSSP-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP)-SANCHEZ MIRA BAY VIEW BOULEVARD INCLUDING ACCESS ROAD LEADING TO BEACH RESORT, SANCHEZ MIRA, CAGAYAN (PHASE 3)

CSSP-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP)-SANCHEZ MIRA BAY VIEW BOULEVARD INCLUDING ACCESS ROAD LEADING TO BEACH RESORT, SANCHEZ MIRA, CAGAYAN (PHASE 3) is a DPWH-tracked public work in Cagayan 2nd DEO, Region II. Reported contract value: ₱39,200,000.00. Status: Reported complete (DPWH). Contractor on record: TJMT CONST. Figures trace to dpwh.

Cagayan 2nd DEO, Region II
Region: Region II

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2022 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22BC0129 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-06-14 → 2022-06-20

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CSSP-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP)-SANCHEZ MIRA BAY VIEW BOULEVARD INCLUDING ACCESS ROAD LEADING TO BEACH RESORT, SANCHEZ MIRA, CAGAYAN (PHASE 3)

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Canayun-Sirit-Dana-ili Flood Control along abulug river, abulug, Cagayan
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Cagayan 2nd DEO · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

227 projects · ₱6.0B total · 35 flags

Other projects by this contractor

No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS MAHARLIKA HIGHWAY (CAGAYAN VALLEY ROAD) - K0541+000 - K0541+533, K0548+000 - K0548+920, K0549+050 - K0549+940, K0550+094 - K0550+605.50

Region II, Region II

2025₱138.5M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF CONCRETE ROAD - GATTARAN DIVERSION ROAD, PACKAGE 1, GATTARAN, CAGAYAN

Cagayan 1st DEO, Region II

2025₱135.1M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE - BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGES - NAGANTATAPIAN BRIDGE (B01094LZ) ALONG CAGAYAN VALLEY ROAD

Region II, Region II

2023₱119.7M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE & RELIABLE NATL RD SYSTEM - ASSET PRESERVATN - REHAB/ RECONST/ UPGRADING OF DAMAGED PAVED RDS - TERTIARY ROADS - REHABILITATION OF PAVED ROAD - BBDSMR- K0519+331-K0519+600.50 TO K0546+000-K0547+1012.5, BAGGAO, CAGAYAN

Cagayan 1st DEO, Region II

2024₱102.4M
Past target date (DPWH On-Going)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF SEAWALL, BARANGAY PADDAYA, APARRI, CAGAYAN

Cagayan 1st DEO, Region II

2025₱96.5M
Past target date (DPWH On-Going)

Construction of Flood Control Structure along Cagayan River, Aguigican, Gattaran, Cagayan, Package 1

GATTARAN (CAGAYAN), CAGAYAN, Region II

2024₱96.5M
Reported complete (DPWH)
View all 227 projects →

4. Implementation

Contract Amount

₱39,200,000.00

Progress

Reported complete (DPWH)

Start Date

March 28, 2022

Target End

April 7, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.