GAA 2025 SSP25CG0127

BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD WITH SLOPE PROTECTION WORKS, BARANGAY BAGANG - BARANGAY BALIBAGO, MASANTOL, PAMPANGA

BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD WITH SLOPE PROTECTION WORKS, BARANGAY BAGANG - BARANGAY BALIBAGO, MASANTOL, PAMPANGA is a DPWH-tracked public work in Pampanga 1st DEO, Region III. Reported contract value: ₱93,869,195.33. Status: Past target date (DPWH On-Going). Contractor on record: HG-III CONST AND DEVELOPMENT CORP F. Figures trace to dpwh.

Pampanga 1st DEO, Region III
Region: Region III

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Pampanga River, (Downstream-Left Bank), Barangay Consuelo, Macabebe, Pampanga
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Pampanga 1st DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

14 projects · ₱1.3B total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF MULTI-PURPOSE BUILDING (HALL OF JUSTICE), SAN JOSE DEL MONTE CITY, BULACAN

Bulacan 2nd DEO, Region III

2024₱198.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. PUNTURIN, VALENZUELA CITY

Metro Manila 3rd DEO, National Capital Region

2023₱187.9M
Past target date (DPWH On-Going)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD WITH SLOPE PROTECTION WORKS, BARANGAY SAGRADA - BARANGAY NIGUI, MASANTOL, PAMPANGA

Pampanga 1st DEO, Region III

2025₱93.8M
Past target date (DPWH On-Going)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD WITH SLOPE PROTECTION WORKS, SITIO PENA, BARANGAY SUA, MASANTOL, PAMPANGA

Pampanga 1st DEO, Region III

2025₱93.8M
Past target date (DPWH On-Going)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD WITH SLOPE PROTECTION WORKS, BEBE ANAC - STA. LUCIA WAKAS ROAD, MASANTOL, PAMPANGA

Pampanga 1st DEO, Region III

2024₱89.2M
Reported complete (DPWH)
No sat.

REHABILITATION OF VCEH MAIN BUILDING WITH SEWERAGE TREATMENT PLANT (STP), MEDICAL GAS AND VACUUM SYSTEM, BARANGAY DALANDANAN, VALENZUELA CITY

Metro Manila 3rd DEO, National Capital Region

2025₱87.6M
Past target date (DPWH On-Going)
View all 14 projects →

4. Implementation

Contract Amount

₱93,869,195.33

Progress

Past target date (DPWH On-Going)

Start Date

June 11, 2025

Target End

January 18, 2026

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.