Buildings and Facilities18DB0222

CONSTRUCTION AND COMPLETION OF SCHOOL BUILDING TWO (2) STOREY SIX (6) CLASSROOM AT DACANLAO G. AGONCILLO NHS, CALACA, BATANGAS

CONSTRUCTION AND COMPLETION OF SCHOOL BUILDING TWO (2) STOREY SIX (6) CLASSROOM AT DACANLAO G. AGONCILLO NHS, CALACA, BATANGAS is a DPWH-tracked public work in Batangas 1st DEO, Region IV-A. Reported contract value: ₱11,668,705.00. Status: Reported complete (DPWH). Contractor on record: VICMAR CONST INC 28997. Figures trace to dpwh.

Batangas 1st DEO, Region IV-A
Region: Region IV-A

Money Trail

1. Appropriation

GAA FY2018 not yet loaded (source: DBM GAA)

2. Allotment

No SARO/NCA release rows linked to this project yet. See DBM release listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

DPWH ID 28997

376 projects · ₱10.1B total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF UNION - BOTONG - CONSUELO - GENERAL LUNA ROAD, SIARGAO, SURIGAO DEL NORTE

Region XIII, Region XIII

2017₱149.6M
Reported complete (DPWH)
No sat.

IMPRVT./WIDENING OF NAT'L. ROADS, ALLEN-CATARMAN ROAD (S00005SM), KO729+000-KO731+300; KO731+350-KO732+949; KO722+751-KO723+480, NORTHERN SAMAR, 1ST LD

Region VIII, Region VIII

2017₱141.7M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONSTRUCTION OF TINGLOY CIRCUMFERENTIAL ROAD - PACKAGE E, SECTION II, TINGLOY, BATANGAS

Batangas 2nd DEO, Region IV-A

2025₱139.2M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONSTRUCTION OF TINGLOY CIRCUMFERENTIAL ROAD - PACKAGE E, SECTION I, TINGLOY, BATANGAS

Batangas 2nd DEO, Region IV-A

2025₱139.2M
Past target date (DPWH On-Going)
No sat.

ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS ALAMINOS - SAN PABLO CITY BY-PASS ROAD, PACKAGE A, LAGUNA

Region IV-A, Region IV-A

2019₱130.0M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, IMPROVEMENT OF ROAD, SAN PASCUAL-SAN JOSE R

Batangas 2nd DEO, Region IV-A

2023₱120.6M
Reported complete (DPWH)
View all 376 projects →

4. Implementation

Contract Amount

₱11,668,705.00

Progress

Reported complete (DPWH)

Start Date

August 1, 2018

Target End

February 26, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.