Roads19D00018

ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS ALAMINOS - SAN PABLO CITY BY-PASS ROAD, PACKAGE A, LAGUNA

ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS ALAMINOS - SAN PABLO CITY BY-PASS ROAD, PACKAGE A, LAGUNA is a DPWH-tracked public work in Region IV-A, Region IV-A. Reported contract value: ₱129,958,020.17. Status: Reported complete (DPWH). Contractor on record: VICMAR CONST INC. Figures trace to dpwh.

Region IV-A, Region IV-A
Region: Region IV-A

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19D00018 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-11-09 → 2017-01-03

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS ALAMINOS - SAN PABLO CITY BY-PASS ROAD, PACKAGE A, LAGUNA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

395 projects · ₱11.0B total · 2 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF UNION - BOTONG - CONSUELO - GENERAL LUNA ROAD, SIARGAO, SURIGAO DEL NORTE

Region XIII, Region XIII

2017₱149.6M
Reported complete (DPWH)
No sat.

IMPRVT./WIDENING OF NAT'L. ROADS, ALLEN-CATARMAN ROAD (S00005SM), KO729+000-KO731+300; KO731+350-KO732+949; KO722+751-KO723+480, NORTHERN SAMAR, 1ST LD

Region VIII, Region VIII

2017₱141.7M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONSTRUCTION OF TINGLOY CIRCUMFERENTIAL ROAD - PACKAGE E, SECTION II, TINGLOY, BATANGAS

Batangas 2nd DEO, Region IV-A

2025₱139.2M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONSTRUCTION OF TINGLOY CIRCUMFERENTIAL ROAD - PACKAGE E, SECTION I, TINGLOY, BATANGAS

Batangas 2nd DEO, Region IV-A

2025₱139.2M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, IMPROVEMENT OF ROAD, SAN PASCUAL-SAN JOSE R

Batangas 2nd DEO, Region IV-A

2023₱120.6M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, BATANGAS-TABANGAO-LOBO RD - K0138+225 - K0138+302, K0

Batangas 2nd DEO, Region IV-A

2025₱110.4M
Past target date (DPWH On-Going)
View all 395 projects →

4. Implementation

Contract Amount

₱129,958,020.17

Progress

Reported complete (DPWH)

Start Date

July 15, 2019

Target End

January 13, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)LagunaCity of San PabloSanta Veronica
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.