ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES, PINAMUCAN BR. (B03039LZ) ALONG BATANGAS-TABANGAO-LOBO RD
ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES, PINAMUCAN BR. (B03039LZ) ALONG BATANGAS-TABANGAO-LOBO RD is a DPWH-tracked public work in Batangas 2nd DEO, Region IV-A. Reported contract value: ₱6,266,393.30. Status: Reported complete (DPWH). Contractor on record: TCSC CORP. Figures trace to dpwh.
Total Contract Cost

