Water Provision and Storage23DD0055

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III), CONSTRUCTION OF WATER SYSTEM AND FACILITIES, BARANGAY DAGATAN, SAN JOSE, BATANGAS

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III), CONSTRUCTION OF WATER SYSTEM AND FACILITIES, BARANGAY DAGATAN, SAN JOSE, BATANGAS is a DPWH-tracked public work in Batangas 4th DEO, Region IV-A. Reported contract value: ₱4,802,057.60. Status: Reported complete (DPWH). Contractor on record: MAC BUILDERS CIVIL ENGINEERING CONST. Figures trace to dpwh.

Batangas 4th DEO, Region IV-A
Region: Region IV-A

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2023 · ₱6,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23DD0055 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-01-03 → 2025-03-11

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III), CONSTRUCTION OF WATER SYSTEM AND FACILITIES, BARANGAY DAGATAN, SAN JOSE, BATANGAS

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱6,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Box Culvert, Cultihan Road, Barangay Salaban, San Jose, Batangas
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Batangas 4th DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

108 projects · ₱653.6M total · 0 flags

Other projects by this contractor

No sat.

CONCRETING OF SITIO CASTILLA, BRGY. STO. NINO FMR, BUSUANGA, PALAWAN

Palawan 1st DEO, Region IV-B

2024₱14.9M
Reported complete (DPWH)
No sat.

PACKAGE 3-CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDINGS IN:1. LAJALA ELEMENTARY SCHOOL, BARANGAY LAJALA, CORON2. BIONG ELEMENTARY SCHOOL, BARANGAY OSMENA, CULION3. BALDAT ELEMENTARY SCHOOL, BARANGAY BALDAT, CULION

Palawan 1st DEO, Region IV-B

2024₱14.9M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BANAYBANAY I AND BANAYBANAY II, SAN JOSE, BAT

Batangas 4th DEO, Region IV-A

2024₱14.4M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, IMPROVEMENT OF ROAD, BARANGAY CATANDALA, IBAAN, BATANGAS

Batangas 4th DEO, Region IV-A

2025₱14.4M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF CONCRETE ROAD, BARANGAY DAYAPAN, IBAAN, BATANGAS

Batangas 4th DEO, Region IV-A

2025₱14.4M
Past target date (DPWH On-Going)
No sat.

PACKAGE 1-CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDINGS IN:1. BALOGO ELEMENTARY SCHOOL, BARANGAY BALOGO2. ARACELI NORTH CENTRAL SCHOOL, BARANGAY POBLACION, ARACELI, PALAWAN

Palawan 1st DEO, Region IV-B

2024₱9.9M
Past target date (DPWH On-Going)
View all 108 projects →

4. Implementation

Contract Amount

₱4,802,057.60

Progress

Reported complete (DPWH)

Start Date

February 8, 2023

Target End

August 6, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.