Buildings and Facilities17NB0224No coordinates published by DPWH

CONSTRUCTION OF CLASSROOM 1STY 2CL, CASANAAG ES, ESPERANZA, AGUSAN DEL SUR

CONSTRUCTION OF CLASSROOM 1STY 2CL, CASANAAG ES, ESPERANZA, AGUSAN DEL SUR is a DPWH-tracked public work in Agusan del Sur 1st DEO, Region XIII. Reported contract value: ₱2,571,724.32. Status: Reported complete (DPWH). Contractor on record: ABADA CONST AND SUPPLY. Figures trace to dpwh.

Agusan del Sur 1st DEO, Region XIII

DPWH did not publish coordinates for this project. Location estimated from the project title (town level only); satellite images may not show the exact site.

Region: Region XIII

No before/after satellite images: DPWH did not publish coordinates, and the location estimated from the project title is only town level, which is not confident enough to image.

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱5,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROVIII-17-0000252 · ₱628,443 · release to the district office, not itemized per project

    Possible match · score 0.63

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17NB0224 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · School building, cost per classroom (new school building)

₱1,285,862 per classroom= 0.9x the Region XIII median (n=254)

Contract cost ₱2,571,724 ÷ 2 classroom read from the DPWH title (“1STY 2CL”; classroom count in title). National percentile: 20. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF CLASSROOM 1STY 2CL, CASANAAG ES, ESPERANZA, AGUSAN DEL SUR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱5,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Hamogaway Flood Control Phase II (Downstream) along Daang Maharlika (Agusan - Davao Section), K0000+000 - K0000+212, Bayugan, Agusan del Sur
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVIII-17-0000252

₱628,443.00 · FY2017

Released to Leyte Normal University (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

81 projects · ₱387.5M total · 0 flags

Other projects by this contractor

View all 81 projects →

4. Implementation

Contract Amount

₱2,571,724.32

Progress

Reported complete (DPWH)

Start Date

January 14, 2018

Target End

April 28, 2018