ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: REPLACEMENT OF PERMANENT WEAK BRIDGE: PADDAD BRIDGE (B04869LZ) ALONG DAANG MAHARLIKA (LZ); STA.352+338.47-STA.352+421.726; STA.352+458.526-STA.352+532.746
ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: REPLACEMENT OF PERMANENT WEAK BRIDGE: PADDAD BRIDGE (B04869LZ) ALONG DAANG MAHARLIKA (LZ); STA.352+338.47-STA.352+421.726; STA.352+458.526-STA.352+532.746 is a DPWH-tracked public work in Region II, Region II. Reported contract value: ₱0.00. Status: Past target date (DPWH On-Going). Contractor on record: ADVANCED FOUNDATION CONST SYSTEMS CORP. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost

