SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF BRIDGE CONNECTING BOLINAO TO SANTIAGO ISLAND (PACKAGE A), BOLINAO, PANGASINAN
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF BRIDGE CONNECTING BOLINAO TO SANTIAGO ISLAND (PACKAGE A), BOLINAO, PANGASINAN is a DPWH-tracked public work in Region I, Region I. Reported contract value: ₱28,347,244.89. Status: Past target date (DPWH On-Going). Contractor on record: M G LUALHATI CONST CORP. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
