REPAIR OF DAMAGED FLOOD CONTROL STRUCTURE ALONG PARUA RIVER (LOURDES SECTION, RIGHT BANK) UPSTREAM OF NEILSEN BRIDGE, STA. 0+000 TO STA. 0+116, BAMBAN, TARLAC
REPAIR OF DAMAGED FLOOD CONTROL STRUCTURE ALONG PARUA RIVER (LOURDES SECTION, RIGHT BANK) UPSTREAM OF NEILSEN BRIDGE, STA. 0+000 TO STA. 0+116, BAMBAN, TARLAC is a DPWH-tracked public work in Tarlac 2nd DEO, Region III. Reported contract value: ₱9,690,235.03. Status: Reported complete (DPWH). Contractor on record: JOE ANAS BUILDERS. Figures trace to dpwh.
Total Contract Cost
