Flood Control and Drainage16CK0212No coordinates published by DPWH

REST, OF ERODED EMBANKMENT OF EXISTING DIKE ALONG MAET CREEK, RI/B (SAN ISIDRO SECT.), LAPAZ, TARLAC

REST, OF ERODED EMBANKMENT OF EXISTING DIKE ALONG MAET CREEK, RI/B (SAN ISIDRO SECT.), LAPAZ, TARLAC is a DPWH-tracked public work in Tarlac 2nd DEO, Region III. Reported contract value: ₱13,960,159.30. Status: Reported complete (DPWH). Contractor on record: JOE ANAS BUILDERS. Figures trace to dpwh.

Tarlac 2nd DEO, Region III

DPWH did not publish coordinates for this project. Location estimated from the project title (town level only); satellite images may not show the exact site.

Region: Region III

No before/after satellite images: DPWH did not publish coordinates, and the location estimated from the project title is only town level, which is not confident enough to image.

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱40,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROXI-17-0006984 · ₱55,000,000 · release to the district office, not itemized per project

    Possible match · score 0.68

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16CK0212 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REST, OF ERODED EMBANKMENT OF EXISTING DIKE ALONG MAET CREEK, RI/B (SAN ISIDRO SECT.), LAPAZ, TARLAC

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structures along Moriones River, Right Side, Balanti Section, Balanti, Tarlac City
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXI-17-0006984

₱55,000,000.00 · FY2017

Released to University of Southeastern Philippines (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

9 projects · ₱165.1M total · 0 flags

Other projects by this contractor

No sat.

REHABILITATION/IMPROVEMENT OF SLOPE PROTECTION IN TARLAC 2ND LD ALONG MASALASA CREEK, MALIWALO - BINAUGANAN SECTION (LEFT BANK, ), STA 0+367 TO STA 0+925

Tarlac DEO, Region III

2016₱40.1M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG MORIONES RIVER RIGHT BANK INCLUDING ROAD COMPONENT, BALANTI SECTION (PHASE IV), BALANTI, TARLAC CITY, TAR

Tarlac DEO, Region III

2019₱37.2M
Reported complete (DPWH)
No sat.

CONSTRUCTION/MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURES AND DRAINAGE SYSTEMS REHABILITATION/IMPROVEMENT OF PAMPANGA RIVER CONTROL BATO FERRY STATION LAUR, NUEVA ECIJA

Nueva Ecija 2nd DEO, Region III

2017₱36.1M
Reported complete (DPWH)
No sat.

CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS REHABILITATION/IMPROVEMENT OF SLOPE PROTECTION ALONG TARLAC RIVER CONTROL RIGHT DIKE, SAN LUIS-CARANGIAN SECTION, TARLAC CITY, TARLAC

Tarlac DEO, Region III

2018₱11.0M
Reported complete (DPWH)
No sat.

REPAIR OF DAMAGED FLOOD CONTROL STRUCTURE ALONG PARUA RIVER (LOURDES SECTION, RIGHT BANK) UPSTREAM OF NEILSEN BRIDGE, STA. 0+000 TO STA. 0+116, BAMBAN, TARLAC

Tarlac 2nd DEO, Region III

2018₱9.7M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION PROGRAM CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS CAPAS-SAN JOSE-MAYANTOC-MALACAMPA RD K0126 + 025

Tarlac DEO, Region III

2019₱6.6M
Reported complete (DPWH)
View all 9 projects →

4. Implementation

Contract Amount

₱13,960,159.30

Progress

Reported complete (DPWH)

Start Date

April 17, 2017

Target End

September 14, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)TarlacCity of Tarlac
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.