Flood Control and Drainage21A00029

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER BANK PROTECTION ALONG BUED RIVER, BRGY. BINDAY, SAN FABIAN, PANGASINAN (PHASE II)

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER BANK PROTECTION ALONG BUED RIVER, BRGY. BINDAY, SAN FABIAN, PANGASINAN (PHASE II) is a DPWH-tracked public work in Region I, Region I. Reported contract value: ₱96,500,000.00. Status: Reported complete (DPWH). Contractor on record: BET CONST. Figures trace to dpwh.

Region I, Region I
Region: Region I

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱93,623,622 · BET CONSTRUCTION & SUPPLY

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-01-10 → 2023-02-01

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Pangasinan

Based on the coordinates published with the DPWH record and NOAH file Pangasinan.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER BANK PROTECTION ALONG BUED RIVER, BRGY. BINDAY, SAN FABIAN, PANGASINAN (PHASE II)

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2021 GAA. DBM GAA FY2021

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

Confirmed (exact contract ID) · 100%

21A00029

₱93,623,622.19 · BET CONSTRUCTION & SUPPLY

Award / contract ref: 21A00029

Contractor

B

399 projects · ₱9.7B total · 0 flags

4. Implementation

Contract Amount

₱96,500,000.00

Progress

Reported complete (DPWH)

Start Date

March 9, 2021

Target End

February 21, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.