LFP: LIP: FLOOD CONTROL STRUCTURES/ FACILITIES; REHAB OF DRAINAGE SYSTEM, BRGY CAPAYA II, AC, PAMP.
LFP: LIP: FLOOD CONTROL STRUCTURES/FACILITIES; REHAB OF DRAINAGE SYSTEM, BRGY CAPAYA II, AC, PAMP. is a DPWH-tracked public work in Pampanga 3rd DEO, Region III. Reported contract value: ₱484,784.49. Status: Reported complete (DPWH). Contractor on record: 3-SIDES BUILDERS. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
