CONSTRUCTION OF FLOOD CONTROL WALL/ RIPRAPPING ALONGTHE BANK OF CREEKS IN BARANGAY 179 (PHASE 3), CALOOCAN CITY
CONSTRUCTION OF FLOOD CONTROL WALL/ RIPRAPPING ALONGTHE BANK OF CREEKS IN BARANGAY 179 (PHASE 3), CALOOCAN CITY is a DPWH-tracked public work in Metro Manila 3rd DEO, National Capital Region. Reported contract value: ₱56,976,882.78. Status: Reported complete (DPWH). Contractor on record: PERSAN CONST INC FORMERLY: PERSAN CONST. Figures trace to dpwh.
Total Contract Cost
