Buildings and Facilities16KE0041No coordinates published by DPWH

CONSTRUCTION OF 1 STOREY 1 CLASSROOM YUMBING NHS

CONSTRUCTION OF 1 STOREY 1 CLASSROOM YUMBING NHS is a DPWH-tracked public work in Camiguin DEO, Region X. Reported contract value: ₱1,197,764.69. Status: Reported complete (DPWH). Contractor on record: SHEEN-SHEEN CONST CORP FORMERLY: SHEEN-SHEEN CONST. Figures trace to dpwh.

Camiguin DEO, Region X

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Region X

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱1,500 (shared by many projects, not this project's own line)

    Possible match · score 0.73

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROV-16-0027749 · ₱8,540,498 · release to the district office, not itemized per project

    Possible match · score 0.68

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱1,095,332 · SHEEN-SHEEN CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · School building, cost per classroom (new school building)

₱1,197,765 per classroom= 0.6x the Region X median (n=280)

Contract cost ₱1,197,765 ÷ 1 classroom read from the DPWH title (“1 CLASSROOM”; classroom count in title). National percentile: 11. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF 1 STOREY 1 CLASSROOM YUMBING NHS

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 73%

UACS
18001
Amount
₱1,500,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Kanluran, San Vicente, Camarines Norte, 2nd LD
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROV-16-0027749

₱8,540,498.00 · FY2016

Released to Division of Sorsogon (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction of one storey 1- classroom Yumbing NH

₱1,095,331.63 · SHEEN-SHEEN CONSTRUCTION

4. Implementation

Contract Amount

₱1,197,764.69

Progress

Reported complete (DPWH)

Start Date

September 9, 2016

Target End

November 17, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.