GAA 2025 OO-225MD0049

CONSTRUCTION OF FLOOD CONTROL STRUCTURE, LIBUNGAN RIVER, CAMANSI BRIDGE (UPSTREAM, DOWNSTREAM AND BOTH SIDES), CAMANSI, ALAMADA, COTABATO

CONSTRUCTION OF FLOOD CONTROL STRUCTURE, LIBUNGAN RIVER, CAMANSI BRIDGE (UPSTREAM, DOWNSTREAM AND BOTH SIDES), CAMANSI, ALAMADA, COTABATO is a DPWH-tracked public work in Cotabato 1st DEO, Region XII. Reported contract value: ₱93,580,875.00. Status: Past target date (DPWH On-Going). Contractor on record: LLABAN CONST. Figures trace to dpwh.

Cotabato 1st DEO, Region XII
Region: Region XII

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱5,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure, Barangay Capayuran, Pigcawayan, North Cotabato
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Cotabato 1st DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

479 projects · ₱8.9B total · 0 flags

4. Implementation

Contract Amount

₱93,580,875.00

Progress

Past target date (DPWH On-Going)

Start Date

July 30, 2025

Target End

February 25, 2026

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.