LLABAN CONST is listed as a company organization in Philippine public procurement records on this site, with 479 linked DPWH project(s) totaling about ₱8,869,779,399.23. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
LLABAN CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 479
- Total value
- ₱8,869,779,399.23
- Published flags
- 0
- Region
- Cotabato 2nd DEO · Region XII
Public Record Grade
A transparent, data-derived summary of reported public records for LLABAN CONST — not an accusation or finding of wrongdoing.
Score: 83.50 / 100 · Projects in sample: 479 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 69.6/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 69.6
- lateCompletedProjects
- 185
- onTimeCompletedProjects
- 262
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 478
- pastTargetOngoingProjects
- 31
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 99.4/100 · Weight: 24%
- totalProjects
- 479
- componentScore
- 99.4
- terminatedProjects
- 1
- terminationRatePct
- 0.2
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0.1
- componentScore
- 100
- projectsWithAbcAndCost
- 479
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 479
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 479
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 434 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TINANAN RIVER, PACKAGE 2, BARANGAY MALIBATUAN, ARAKAN, COTABATO25MC0044 · ₱112,215,990.00 · mapped
- CONSTRUCTION OF CONCRETE ROAD ALONG SITIO LIMATONG-CAMPO 1 AND KAGUIRINGAN FALLS LEADING TO HIKING JUMP-OFF SITE TO MT. AGKIR-AGKIR, LIBUNGAN, COTABATO21MD0067 · ₱96,500,000.00 · mapped
- CONCRETING OF CROSSING MATAS-POBLACION TO TAGBAC TO MAGCAALAM TO KIRONGDONG WATER FALLS TOURISM ROAD, MAGPET, COTABATO22MC0086 · ₱96,500,000.00 · mapped
- CONSTRUCTION OF PUROK 3 - PUROK 9, MALAMOTE TO BARANGAY PENTIL ROAD, MIDSAYAP AND ALEOSAN, NORTH COTABATO23MD0059 · ₱96,500,000.00 · mapped
- CONSTRUCTION OF CONCRETE ROAD - SITIO LAMPAKI-CAMPO 3 AGRI-TOURIST ROAD PASSING THROUGH LAMPAKI 7 FALLS, BRGY. KIMARAYAG, PIGCAWAYAN, NORTH COTABATO22MD0082 · ₱96,500,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LIBUNGAN RIVER (UPSTREAM AND DOWNSTREAM OF GREBONA BRIDGE-GREBONA SECTION), BARANGAY GREBONA, LIBUNGAN, NORTH COTABATO24MD0050 · ₱96,300,000.00 · mapped
- JCT. DAVAO-COTABATO (CROSSING BAGUER) - SITIO DALUMANGKOM-SITIO LAMPAKI ROAD, ALAMADA, NORTH COTABATO, PACKAGE II24MD0032 · ₱96,017,500.00 · mapped
- SITIO LAMPAKI-CAMPO 3 AGRI- TOURIST ROAD PASSING THROUGH LAMPAKI 7 FALLS, BRGY. KIMARAYAG, PIGCAWAYAN, NORTH COTABATO24MD0053 · ₱96,017,499.97 · mapped
- ROAD WIDENING-DUALING-NEW PANAY-MIDSAYAP ROAD, ALEOSAN, COTABATO18MD0071 · ₱95,633,288.12 · mapped
- JCT. DAVAO-COTABATO (CROSSING BAGUER)-SITIO DALUMANGKOM-SITIO LAMPAKI ROAD, ALAMADA, NORTH COTABATO, PACKAGE I, ALAMADA, COTABATO24MD0018 · ₱95,534,999.99 · mapped
- SITIO LAMPAKI-CAMPO 3 AGRI-TOURIST ROAD PASSING THROUGH LAMPAKI 7 FALLS, BRGY. KIMARAYAG, PIGCAWAYAN, NORTH COTABATO, PIGCAWAYAN, COTABATO23MD0076 · ₱95,534,999.95 · mapped
- SITIO LAMPAKI-CAMPO 3 AGRI-TOURIST ROAD PASSING THROUGH LAMPAKI 7 FALLS, BRGY. KIMARAYAG, PIGCAWAYAN, NORTH COTABATO, PACKAGE II, PIGCAWAYAN, NORTH COTABATO23MD0081 · ₱95,534,999.68 · mapped
- CONSTRUCTION OF CONCRETE ROAD - JCT. DAVAO - COTABATO (CROSSING BAGUER) - SITIO DALUMANGKOM - SITIO LAMPAKI ROAD, ALAMADA, NORTH COTABATO23MD0071 · ₱95,534,999.50 · mapped
- CONSTRUCTION OF CONCRETE ROAD ALONG JCT. DAVAO-COTABATO (CROSSING BAGUER)-SITIO DALUMANGKOM-SITIO LAMPAKI ROAD, ALAMADA, NORTH COTABATO21MD0069 · ₱95,528,284.72 · mapped
- CONSTRUCTION OF CONCRETE ROAD - KIMARAYAG - NORTH COTABATO ACADEMY - SITIO TINAGO LEADING TO TINAGO FALLS, KIMARAYAG, PIGCAWAYAN, NORTH COTABATO23MD0057 · ₱95,052,499.94 · mapped
- CONSTRUCTION OF BALOGO RIVER FLOOD CONTROL STRUCTURE, ANICK SECTION, BARANGAY ANICK, PIGCAWAYAN, COTABATO25MD0038 · ₱94,353,796.50 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, LIBUNGAN RIVER, CAMANSI BRIDGE (UPSTREAM, DOWNSTREAM AND BOTH SIDES), CAMANSI, ALAMADA, COTABATO25MD0049 · ₱93,580,875.00 · mapped
- ROAD WIDENING - ALONG MAKILALA ALLAH VALLEY RD (S00692MN) K1617+120 TO K1619+623 MAKILALA, NORTH COTABATO20MC0005 · ₱91,673,000.00 · mapped
- CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ROAD - DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT) - K1598 + 450 - K1598 + 470.10, K1598 + 550 - K1598 + 570.10, K1599 + 200 - K1599 + 220.10, K1600 + 900 - K1600 + 920.10, K1601 + 080 - K1601 + 100.10, K1602 + 20024MC0018 · ₱86,839,991.41 · mapped
- CONSTRUCTION OF ROAD - BENOLIGAN-ONICA-DALAPITAN ROAD, KIDAPAWAN CITY AND MATALAM, NORTH COTABATO24MC0064 · ₱86,349,999.99 · mapped
- ROAD WIDENING OF DAVAO-COTABATO ROAD (JCT. DIGOS-COTABATO SECTION), K1626+684-K1630+345 (CHAINAGE 33659-CHAINAGE 37335); KIDAPAWAN CITY, COTABATO.17M00047 · ₱82,248,661.89 · mapped
- CONSTRUCTION OF CONCRETE ROAD - BINOLIGAN-AMAZION, KIDAPAWAN CITY, NORTH COTABATO24MC0062 · ₱81,975,000.00 · mapped
- ROAD WIDENING -ON SPECIFIC LOCATIONS ALONG PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD (S00701MN) K1630+524 TO K1634+212, PRES. ROXAS, NORTH COTABATO20MC0006 · ₱81,089,065.00 · mapped
- JCT. DULAO - RICOR - NEW LEON - PATAG, DADO ROAD IN SUPPORT OF BANANA, COFFEE AND HIGHLAND VEGETABLE PRODUCTION AND MARKETING, ALAMADA, NORTH COTABATO25MD0057 · ₱78,688,497.12 · mapped
- JCT. MIMBALAWAG-BAROWIN-BASAQUE ROAD IN SUPPORT OF BANANA, COFFEE AND HIGHLAND VEGETABLE PRODUCTION AND MARKETING, ALAMADA, NORTH COTABATO24MD0031 · ₱76,813,999.98 · mapped
- LAWILI - PALACAT - BAO ROAD IN SUPPORT OF BANANA, CORN, COCONUT, AND PALM OIL INDUSTRIES, ALAMADA - ALEOSAN, NORTH COTABATO24MD0033 · ₱76,813,999.98 · mapped
- CONSTRUCTION OF LIBUNGAN RIVER FLOOD CONTROL PROJECT (UPSTREAM AND DOWNSTREAM OF MAPUROK BRIDGE - POLAYAGAN SECTION), POLAYAGAN, ALAMADA, NORTH COTABATO25MD0065 · ₱74,870,104.00 · mapped
- WIDENING ALONG DAVAO-COTABATO ROAD (JCT. DIGOS-COTABATO SECT.), K1612+700 - K1614+207, K1617+560 - K1617+910, K1621+768 - K1622+500 KIDAPAWAN CITY, NORTH COTABATO15M00105 · ₱72,496,356.62 · mapped
- CONSTRUCTION OF CONCRETE ROAD ALONG SITIO LAMPAKI-CAMPO 3 AGRI-TOURIST ROAD PASSING THROUGH LAMPAKI 7 FALLS, BRGY. KIMARAYAG, PIGCAWAYAN, NORTH COTABATO21MD0068 · ₱70,103,390.00 · mapped
- CONSTRUCTION OF CONCRETE BRIDGE LINDONGAN FLAT SLAB BRIDGE ALONG DAVAO-COTABATO RD., LINDONGAN, ALEOSAN, COTABATO19MD0130 · ₱68,600,000.00 · mapped
- CONCRETING OF ROAD INCLUDING DRAINAGE, ALONG NURSERY ROAD TO JCT. ALBERT MORROW BOULEVARD, BARANGAY KATANGAWAN, GENERAL SANTOS CITY, SOUTH COTABATO21MB0014 · ₱67,550,000.00 · mapped
- CONSTRUCTION OF CONCRETE ROAD, PACAO-KILOYAO-SINAPANGAN ROAD, ALAMADA-LIBUNGAN, NORTH COTABATO22MD0079 · ₱65,620,000.00 · mapped
- JCT. DAVAO - COTABATO (CROSSING BAGUER) - SITIO DALUMANGKOM - SITIO LAMPAKI ROAD, PIGKAWAYAN, NORTH COTABATO25MD0059 · ₱65,516,745.00 · mapped
- REHABILITATION OF MALABUAN-BATO-MALUNGON-LACOBE FMR, MAKILALA, NORTH COTABATO17MC0193 · ₱63,836,786.86 · mapped
- ROAD WIDENING ALONG DAVAO-COTABATO RD (JCT. DIGOS-COTABATO SECT) K1624+702-K1626+684, KIDAPAWAN CITY, COTABATO20MC0004 · ₱63,690,000.00 · mapped
- REHABILITATION OF PUROK 5, BARANGIRAN-BAYANG-MAKIKILO-SITIO LAMA FMR, ALAMADA, COTABATO18MD0231 · ₱58,398,930.94 · mapped
- LIBUNGAN RIVER FLOOD CONTROL PROJECT (PUROK 3 SECTION), NALIN, MIDSAYAP, COTABATO24MD0052 · ₱57,899,946.97 · mapped
- REHABILITATION OF SLOPE PROTECTION OF PATULANGON BR, SINALLANGAN BR, BALUGAN BR, BULATUKAN BR, MALASILA BR, TULUAN BR, LAMITAN BR, MALAANG BR, AND SAGUING BR, ALONG DAVAO - COTABATO RD (JCT DIGOS - COTABATO SECT) PRIMARY NATIONAL ROAD (WITHIN MAKILALA SEC21MC0051 · ₱57,832,450.00 · mapped
- ROAD WIDENING ALONG DUALING-NEW PANAY-MIDSAYAP ROAD, STA. CRUZ, ALEOSAN, NORTH COTABATO20MD0016 · ₱56,874,205.00 · mapped
- CONSTRUCTION OF BRIDGE APPROACHES AT POLAYAGAN TO MAPUROK, ALAMADA, NORTH COTABATO25MD0061 · ₱56,139,261.00 · mapped
- CONSTRUCTION OF BRIDGE APPROACHES CONNECTING CAMANSI AND BARANGAY PACAO, ALAMADA, NORTH COTABATO25MD0039 · ₱56,120,096.10 · mapped
- LIBUNGAN FLOOD CONTROL (GUMAGA SECTION-PHASE II) ALONG LIBUNGAN RIVER, GUMAGA, LIBUNGAN, COTABATO21MD0025 · ₱55,535,750.00 · mapped
- ROAD WIDENING - KIDAPAWAN-MAGPET-PANGAOAN RD - K1619 + (-554) - K1620 + 000, KIDAPAWAN CITY22MC0084 · ₱53,511,180.00 · mapped
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG BANISILAN-GUILING-ALAMADA-LIBUNGAN ROAD, ALAMADA, NORTH COTABATO20MD0042 · ₱52,254,749.52 · mapped
- NICAAN RIVER FLOOD CONTROL PROJECT (PHASE III), SUBSIDIARY OF LIBUNGAN RIVER, NICAAN, LIBUNGAN, COTABATO21MD0050 · ₱51,216,313.47 · mapped
- NICAAN RIVER FLOOD CONTROL PROJECT (PROJECT IV), SUBSIDIARY OF LIBUNGAN RIVER, NICAAN, LIBUNGAN, COTABATO21MD0049 · ₱51,216,284.88 · mapped
- CONCRETING OF BARANGAY KIMARAYAG-LAMPAKI, PIGCAWAYAN TO BARANGAY MAMPUROK, ALAMADA, NORTH COTABATO18MD0159 · ₱49,179,901.29 · mapped
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD - K1667 + 557- K1667 + 607, ARAKAN, COTABATO24MC0017 · ₱49,000,000.00 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF MALASILA RIVER FLOOD CONTROL L/S, BRGY, BULACANON, MAKILALA, NORTH COTABATO21MC0013 · ₱49,000,000.00 · mapped
- CONSTRUCTION OF ROAD SLOPE PROTECTION ALONG SITIO TAWAN-TAGBAC ROAD AT BRGY. TAGBAC, MAGPET, COTABATO22MC0085 · ₱49,000,000.00 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →