Roads22KB0067

ROAD WIDENING ALONG SAYRE HIGHWAY, K1557+705-K1557+955, NORTH POBLACION, MARAMAG, BUKIDNON

ROAD WIDENING ALONG SAYRE HIGHWAY, K1557+705-K1557+955, NORTH POBLACION, MARAMAG, BUKIDNON is a DPWH-tracked public work in Bukidnon 2nd DEO, Region X. Reported contract value: ₱10,417,400.00. Status: Reported complete (DPWH). Contractor on record: MAFIL BUILDERS INC. Figures trace to dpwh.

Bukidnon 2nd DEO, Region X
Region: Region X

Follow the peso

2 of 5 steps linked from public records. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2022 · ₱50,000

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    Not yet linked

  3. 3. PhilGEPS award

    Not yet linked

  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-03-18 → 2025-11-23

    Same record (DPWH contract ID)

    DPWH source ↗
  5. 5. COA audit finding

    Not yet linked

Unit-cost benchmark · Road, cost per km (widening)

₱41,669,600 per km= 1.2x the Region X median (n=383)

Contract cost ₱10,417,400 ÷ 0.25 km read from the DPWH title (“K1557+705-K1557+955”; K-post / station range length). National percentile: 71. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Maramag Maradugao Road (Downstream), Macapantig Bridge with Slope Protection, Kalilangan, Bukidnon
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Bukidnon 2nd DEO · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

4. Implementation

Contract Amount

₱10,417,400.00

Progress

Reported complete (DPWH)

Start Date

April 6, 2022

Target End

August 10, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.