Construction of Flood Mitigation Structure at Bito River (Upstream), Brgy. Magkaipit, San Fernando, Masbate
Construction of Flood Mitigation Structure at Bito River (Upstream), Brgy. Magkaipit, San Fernando, Masbate is a DPWH-tracked public work in SAN FERNANDO (MASBATE), MASBATE, Region V. Reported contract value: ₱23,519,966.83. Status: Reported complete (DPWH). Contractor on record: KYLA CONST SUPPLY. Figures trace to sumbong.
Total Contract Cost
