GAA 2017 MFO-117M00004

ROAD UPGRADING (UNPAVED TO PAVED) ALONG AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI ROAD, PALIMBANG, SULTAN KUDARAT, K1983+999 TO K1985+000, (CHAINAGE 6879 TO CHAINAGE 7780), K1990+717-K1992+809 (CHAINAGE 13596-CHAINAGE15688)

ROAD UPGRADING (UNPAVED TO PAVED) ALONG AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI ROAD, PALIMBANG, SULTAN KUDARAT, K1983+999 TO K1985+000, (CHAINAGE 6879 TO CHAINAGE 7780), K1990+717-K1992+809 (CHAINAGE 13596-CHAINAGE15688) is a DPWH-tracked public work in Region XII, Region XII. Reported contract value: ₱144,698,724.82. Status: Reported complete (DPWH). Contractor on record: GEMMA CONST SUPPLY INC FORMERLY:GEMMA CON. Figures trace to dpwh.

Region XII, Region XII
Region: Region XII

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17M00004 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-01-31 → 2025-05-05

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (new paving / upgrading)

₱46,782,646 per km= 1.6x the Region XII median (n=242)

Contract cost ₱144,698,725 ÷ 3.093 km read from the DPWH title (“K1983+999 TO K1985+000; K1990+717-K1992+809”; K-post / station range length). National percentile: 84. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ROAD UPGRADING (UNPAVED TO PAVED) ALONG AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI ROAD, PALIMBANG, SULTAN KUDARAT, K1983+999 TO K1985+000, (CHAINAGE 6879 TO CHAINAGE 7780), K1990+717-K1992+809 (CHAINAGE 13596-CHAINAGE15688)

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2017 GAA. DBM GAA FY2017

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

296 projects · ₱27.9B total · 0 flags

4. Implementation

Contract Amount

₱144,698,724.82

Progress

Reported complete (DPWH)

Start Date

March 22, 2017

Target End

May 31, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.