Roads20PG0029

CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROAD KIANGAN - TINOC - BUGUIAS ROAD, KO321+310, KO325+040, KO326+450

CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROAD KIANGAN - TINOC - BUGUIAS ROAD, KO321+310, KO325+040, KO326+450 is a DPWH-tracked public work in Ifugao 1st DEO, Cordillera Administrative Region. Reported contract value: ₱2,112,077.08. Status: Reported complete (DPWH). Contractor on record: CJ ALCONS CONST. Figures trace to dpwh.

Ifugao 1st DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱17,000 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20PG0029 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-05-18 → 2018-05-18

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROAD KIANGAN - TINOC - BUGUIAS ROAD, KO321+310, KO325+040, KO326+450

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱17,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Banao Flood Control (Tungngod Side), Lagawe, Ifugao
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Ifugao 1st DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

Not graded

45 projects · ₱638.3M total · 0 flags

Other projects by this contractor

No sat.

25PJ0033: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF BRIDGE, (MINANGA) ALONG STA. MARIA - SAN MARCOS, ALFONSO

Ifugao 2nd DEO, Cordillera Administrative Region

2025₱77.2M
Past target date (DPWH On-Going)
No sat.

25PJ0028: FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, STA. 52+500 - STA. 53+400 (L/S), ALIMIT, MAYOYAO, IFUGAO

Ifugao 2nd DEO, Cordillera Administrative Region

2025₱75.6M
Past target date (DPWH On-Going)
No sat.

24PJ0042-CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF MINANGNGA BRIDGE, AL

Ifugao 2nd DEO, Cordillera Administrative Region

2024₱34.3M
Reported complete (DPWH)
No sat.

23PJ0039: CONVERGENCE AND SPECIALSUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADSCONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES-CONSTRUCTION OFROAD, AWAN-IGID, VIEWPO

Ifugao 2nd DEO, Cordillera Administrative Region

2023₱31.4M
Reported complete (DPWH)
No sat.

LAGAWE-BOLIWONG-ABINUAN ROAD LEADING TO INCHANG FALLS LAGAWE, IFUGAO

Ifugao 1st DEO, Cordillera Administrative Region

2020₱29.4M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF LAMUT FLOOD CONTROL, LAMUT, IFUGAO

Ifugao 1st DEO, Cordillera Administrative Region

2020₱26.9M
Reported complete (DPWH)
View all 45 projects →

4. Implementation

Contract Amount

₱2,112,077.08

Progress

Reported complete (DPWH)

Start Date

November 3, 2020

Target End

December 29, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.