CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF FLOOD CONTROL AT BARAS BIRD SANCTUARY IN BARANGAY BARAS, TACURONG CITY, SULTAN KUDARAT
CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF FLOOD CONTROL AT BARAS BIRD SANCTUARY IN BARANGAY BARAS, TACURONG CITY, SULTAN KUDARAT is a DPWH-tracked public work in Sultan Kudarat 1st DEO, Region XII. Reported contract value: ₱2,905,367.17. Status: Reported complete (DPWH). Contractor on record: ISULAN ECT CONST. Figures trace to dpwh.
Total Contract Cost
