DPWH projects in Sultan Kudarat
1,867 DPWH public works projects are recorded in Sultan Kudarat (Region Xii), with start dates from 2016 to 2025. Recorded contract values total about ₱25,476,436,682.96. 1,801 are recorded at 100% progress and 136 are flood control works. Figures are as recorded by DPWH; they are not findings.
Largest recorded projects
- Construction of Flood Mitigation Structure, Ala River, Purok Mabuhay, Brgy. Bambad, Isulan, Sultan Kudarat₱144,699,459.11
- Construction of Flood Mitigation Structure, Ala River, Taga Section - Upstream (L/S),Lambayong, Sultan Kudarat₱144,573,812.72
- Contruction of Road Slope Protection Structure - Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd - K1979+640 - K1979+700, K1980+485 - K1980+545, K1980+684 - K1980+698, K1980+745 - K1980+761, K1980+787 - K1980+826, K1981+806 - K1981+848, K1981+976 - K19₱144,017,440.40
- Construction of Road Slope Protection Structure - Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd - K2008+789 - K2008+839, K2008+930 - K2009+050, K2009+183 - K2009+298, K2009+584 - K2009+614, K2009+635 - K2009+790, K2010+141 - K2010+190, K2011+573 - K20₱144,013,775.09
- Construction of Road Slope Protection Structure - Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd - K1923 + 879 - K1924 + 014, K1924 + 513 - K1924 + 660₱141,855,000.00
- Construction of Road Slope Protection Structure - Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd - K1923+070 - K1923+160, K1923+168 - K1923+315₱135,087,353.25
- Dulawan-Marbel Rd - K1742 + (-599) - K1742 + (-335), K1742 + (-260) - K1744 + 380, Pinguiaman, Lambayong, Sultan Kudarat₱123,962,301.14
- Construction of Riverbank Protection/Flood Control at Ala River, Barangay Salabaca, Esperanza, Sultan Kudarat₱123,188,760.58
- Construction of River Bank Protection at Bagumbayan River, Barangay Poblacion, Bagumbayan, Sultan Kudarat₱121,665,057.19
- Construction of River Bank Protection (Upstream Left Side), Barangay Barongis, Palimbang, Sultan Kudarat₱120,649,493.70
- Construction of Flood Control Structure, Ala River Road Dike, Package B - Phase 3, Lambayong, Sultan Kudarat₱110,005,802.70
- Preventive Maintenance of Road:Asphalt Overlay - Dulawan - Marbel Rd - K1762 + 433 - K1763 + 418₱109,980,170.64
- Construction of River Bank Protection at Barangay Gapok, Senator Ninoy Aquino, Sultan Kudarat₱106,099,000.00
- Construction of Flood Control Structure, Ala River Road Dike, Package A - Phase 4, Lambayong, Sultan Kudarat₱106,044,862.40
- Construction of Road Slope Protection Structure - Isulan Jct-Ninoy Aquino Rd - K1800+500 - K1800+515, K1802+324 - K1802+344, K1808+552 - K1808+577, K1808+900 - K1808+935, K1809+640 - K1809+690, K1810+090 - K1810+115, K1810+245 - K1810+260, K1813+360 - K18₱102,605,339.63
- Construction of River Bank Protection at Upper Mono River, Barangay Titulok, Bagumbayan, Sultan Kudarat₱100,837,750.00
- Construction of River Bank Protection at Kulaman River, Barangay Kulaman, Senator Ninoy Aquino, Sultan Kudarat₱99,781,560.61
- Preventive Maintenance of Road:Asphalt Overlay - Dulawan - Marbel Rd - K1764 + (-526) - K1764 + 344₱98,392,972.10
- Construction of Flood Control Structure Along Buayan River (Maindang Section), Lutayan, Sultan Kudarat₱97,730,411.86
- Construction of Flood Control Structure Along Buayan River (Sampao Section), Lutayan, Sultan Kudarat₱97,656,143.98
- Construction of River Bank Protection at Barangay Santa Clara, Kalamansig, Sultan Kudarat₱96,500,000.00
- Road Widening Along Isulan Jct. - Ninoy Aquino Road - K1788+000 - K1791+526 Bagumbayan, Sultan Kudarat₱96,500,000.00
- Replacement of Permanent Weak Bridges - Limulan Br. (B00628mn) Along Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd₱96,499,985.39
- Construction of River Bank Protection at Brgy. Lupoken, Palimbang, Sultan Kudarat₱96,499,932.16
- Construction of River Bank Protection/Flood Control at Limulan River (Downstream), Kalamansig, Sultan Kudarat₱96,499,839.71