JV CONSTECH is listed as a company organization in Philippine public procurement records on this site, with 204 linked DPWH project(s) totaling about ₱1,119,879,556.42. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
JV CONSTECH
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 204
- Total value
- ₱1,119,879,556.42
- Published flags
- 2
- Region
- Sultan Kudarat 2nd DEO · Region XII
Online presence
Google Maps: Jv ConstechGoogle Maps, 2026-10-22
J3R8+6GV, Lebak - Upi Rd, Lebak, Sultan Kudarat
Licensed officers (PCAB)
- Florante M. Magbanua · Authorized Managing Officer (PCAB license 35974) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for JV CONSTECH — not an accusation or finding of wrongdoing.
Score: 87.90 / 100 · Projects in sample: 204 · As of Oct 22, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 76.5/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 76.5
- lateCompletedProjects
- 81
- onTimeCompletedProjects
- 117
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 202
- pastTargetOngoingProjects
- 4
- undatedCompletedProjectsExcluded
- 2
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 204
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 204
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.9/100 · Weight: 11%
- projects
- 204
- componentScore
- 99.9
- flagsPerProject
- 0
- publishedV2Flags
- 1
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 204
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 49 of 202 geotagged projects (largest by contract value) — Open full map
- WIDENING OF PERMANENT BRIDGES - SALAMAN BR. (B00624MN) ALONG AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI RD, LEBAK, SULTAN KUDARAT22MH0021 · ₱48,829,000.00 · mapped
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES,SALAMAN BR. (B00624MN) ALONG AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI ROAD LEBAK, SULTAN KUDARAT18MH0056 · ₱44,554,933.59 · mapped
- ROAD CONCRETING OF BRGY. BASAK-VILLAMONTE-CAPILAN CONNECTING TO NEW CALINOG, IN SUPPORT OF BAMBOO AND COFFEE PLANTATION LEBAK, SULTAN KUDARAT19MH0090 · ₱39,127,480.00 · mapped
- WIDENING OF PERMANENT BRIDGES - BALAYAN BR. (B00618MN) ALONG AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI RD LEBAK, SULTAN KUDARAT23MH0014 · ₱29,890,000.00 · mapped
- CONSTRUCTION OF CONCRETE ROAD - BRGY. BASAK-VILLAMONTE-CAPILAN CONNECTING TO NEW CALINOG IN SUPPORT OF BAMBOO AND COFFEE PLANTATION LEBAK, SULTAN KUDARAT20MH0027 · ₱28,126,000.00 · mapped
- CONSTRUCTION OF CONCRETE ROAD - BRGY. BASAK-VILLAMONTE-CAPILAN CONNECTING TO NEW CALINOG IN SUPPORT OF BAMBOO AND COFFEE PLANTATION, LEBAK, SULTAN KUDARAT21MH0029 · ₱25,532,920.00 · mapped
- CONSTRUCTION OF CONCRETE ROAD - BRGY. BASAK-VILLAMONTE-CAPILAN CONNECTING TO NEW CALINOG IN SUPPORT OF BAMBOO AND COFFEE PLANTATION, LEBAK, SULTAN KUDARAT22MH0029 · ₱25,532,920.00 · mapped
- CONSTRUCTION OF CONCRETE ROAD - BRGY. BASAK-VILLAMONTE-CAPILAN CONNECTING TO NEW CALINOG IN SUPPORT OF BAMBOO AND COFFEE PLANTATION, LEBAK, SULTAN KUDARAT24MH0027 · ₱24,500,000.00 · mapped
- REHABILITATION/MAJOR REPAIR OF BRIDGE - UPPER LIMULAN BR. (B01782MN) ALONG SNA-LEBAK-KALAMANSIG RD25MH0018 · ₱24,468,517.42 · mapped
- WIDENING OF TIPUDOS BRIDGE (B00626MN) ALONG AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI ROAD KALAMANSIG, SULTAN KUDARAT20MH0015 · ₱24,382,400.00 · mapped
- CONSTRUCTION OF CONCRETE ROAD - BRGY. BASAK-VILLAMONTE-CAPILAN CONNECTING TO NEW CALINOG IN SUPPORT OF BAMBOO COFFEE PLANTATION, LEBAK, SULTAN KUDARAT25MH0035 · ₱24,376,447.17 · mapped
- CONSTRUCTION OF CONCRETE ROAD - ROAD IN LIMULAN TO PUSOT AREA LEADING TO MARKET AND PROCESSING CENTER IN SUPPORT OF COFFEE, COCONUT, AND CORN INDUSTRIES, BRGY. LIMULAN, KALAMANSIG, SULTAN KUDARAT25MH0033 · ₱24,364,306.81 · mapped
- REHABILITATION/RECONSTRUCTION OF NAT'L ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI ROAD; K1961+485-K1961+655, K1962+650-K1962+700,K1968+080-K1968+160,K1969+200-K1969+240,K1971+600-K1971+620,19MH0001 · ₱22,284,220.00 · mapped
- ROAD WIDENING - AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI RD - K1918+(-590) - K1918+00025MH0013 · ₱21,498,034.24 · mapped
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI RD - K1985+970 - K1986+010 PALIMBANG, SULTAN KUDARAT23MH0004 · ₱20,996,470.88 · mapped
- CONSTRUCTION OF CONCRETE ROAD - NEW CALINOG ROAD LEADING TO TRES ANDANAS FALLS BRGY. NEW CALINOG, LEBAK, SULTAN KUDARAT22MH0027 · ₱19,600,000.00 · mapped
- CONSTRUCTION OF CONCRETE ROAD - NEW CALINOG ROAD LEADING TO TRES ANDANAS FALLS, NEW CALINOG, LEBAK, SULTAN KUDARAT21MH0027 · ₱19,600,000.00 · mapped
- CONSTRUCTION OF CONCRETE ROAD - NEW CALINOG ROAD LEADING TO TRES ANDANAS FALLS, BRGY. NEW CALINOG, LEBAK, SULTAN KUDARAT20MH0025 · ₱18,915,276.34 · mapped
- RECONSTRUCTION TO CONCRETE PAVEMENT - AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI RD - K1913+960 - K1914+11025MH0006 · ₱18,536,772.82 · mapped
- WIDENING OF BRIDGE - PANGAWAN BR. 1 (B01263MN) ALONG AWANG-UPI-LEBAK-KALAMNSIG-PALIMBANG-SARANGANI RD25MH0020 · ₱16,184,819.77 · mapped
- CONCRETING OF NATIONAL HIGHWAY TO SITIO MINOROK, BRGY. LIMULAN FMR, BRGY. LIMULAN, KALAMANSIG, SULTAN KUDARAT24MH0103 · ₱14,924,972.99 · mapped
- CONCRETING OF PUROK TAYANG TO PUROK BANGSI, BRGY. TIBPUAN FMR, BRGY. TIBPUAN, LEBAK, SULTAN KUDARAT24MH0104 · ₱14,924,542.46 · mapped
- CONSTRUCTION OF TRAN CIS PROTECTION DIKE, LEBAK, SULTAN KUDARAT25MH0031 · ₱14,679,999.88 · mapped
- CONSTRUCTION OF SEA WALL PROTECTION, K0+000 - K0+300 BRGY. STA. CLARA, KALAMANSIG, SULTAN KUDARAT18MH0045 · ₱14,403,379.79 · mapped
- WIDENING OF CADIZ BRIDGE (B00627MN) ALONG AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI ROAD KALAMANSIG, SULTAN KUDARAT20MH0016 · ₱14,092,400.00 · mapped
- WIDENING OF MARIGAEG BRIDGE (B00625MN) ALONG AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI ROAD LEBAK, SULTAN KUDARAT20MH0014 · ₱12,861,138.68 · mapped
- CONSTRUCTION OF CONCRETE ROAD - NRJ LEADING TO MANGROVE ECOTOURISM PARK BRGY. TAGUISA, LEBAK, SULTAN KUDARAT19MH0088 · ₱12,595,686.80 · mapped
- CONCRETING OF SITIO MANGLE, BRGY. KINUDALAN FMR, BRGY. KINUDALAN, LEBAK, SULTAN KUDARAT21MH0121 · ₱10,971,514.40 · mapped
- CONCRETING OF BRGY. SALAMAN FMR, BRGY. SALAMAN, LEBAK, SULTAN KUDARAT21MH0122 · ₱10,535,404.33 · mapped
- CONSTRUCTION OF THREE (3) STOREY SIX (6) CLASSROOMS AT KALAMANSIG NATIONAL HIGH SCHOOL, KALAMANSIG, SULTAN KUDARAT16MH0030 · ₱10,309,052.71 · mapped
- CONSTRUCTION OF TWO (2) STOREY - TWO (2) LABORATORY (ICT LAB) AT SANGAY NATIONAL HIGH SCHOOL KALAMANSIG, SULTAN KUDARAT18MH0117 · ₱9,975,683.90 · mapped
- CONSTRUCTION OF 1-STOREY 3-CLASSROOM SCHOOL BUILDING IN BONIFACIO DIFUNTORUM MEMORIAL ELEMENTARY SCHOOL, BARANGAY POLOY-POLOY, LEBAK, SULTAN KUDARAT24MH0105 · ₱9,946,580.18 · mapped
- CONSTRUCTION OF ROAD FROM BRGY. TIBPUAN TO BRGY. KINUDALAN, LEBAK, SULTAN KUDARAT22MH0064 · ₱9,900,000.00 · mapped
- CONSTRUCTION OF TWO (2) STOREY - TWO (2) LABORATORY (ICT LAB) AT STA. CLARA NATIONAL HIGH SCHOOL KALAMANSIG, SULTAN KUDARAT18MH0133 · ₱9,896,455.62 · mapped
- CONCRETING OF PUROK MOLAVE 2A TO BRGY. HALL, BRGY. AURELIO F. FREIRES, SR. FMR, BRGY. AURELIO F. FREIRES, SR., LEBAK, SULTAN KUDARAT25MH0120 · ₱9,891,633.63
- CONCRETING OF BRGY. NULING PROPER TO SITIO LOWER NULING FMR, BRGY NULING, LEBAK, SULTAN KUDARAT23MH0095 · ₱9,860,998.99 · mapped
- COMPLETION OF MULTI-PURPOSE BUILDING (MINI GYM), MUNICIPAL COMPOUND, LEBAK, SULTAN KUDARAT16MH0022 · ₱9,555,644.63 · mapped
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGE, MARIGAEG BR. (B00625(MN) ALONG AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI ROAD, LEBAK, SULTAN KUDARAT.18MH0057 · ₱8,983,093.25 · mapped
- CONSTRUCTION/REHABILITATION OF ACCESSIBILITY FACILITIES FOR PHYSICALLY CHALLENGED PERSONS AT BAGUMBAYAN, SULTAN KUDARAT17MH0061 · ₱6,176,261.57 · mapped
- CONSTRUCTION OF ONE (1) STOREY - FIVE (5) CLASSROOMS SCHOOL BUILDING WITH TOILET AT PAKIL ELEMENTARY SCHOOL LEBAK, SULTAN KUDARAT17MH0229 · ₱5,893,283.68 · mapped
- A. CONSTRUCTION/REHABILITATION OF ACCESSIBILITY FACILITIES FOR PHYSICALLY CHALLENGED PERSONS AT PALIMBANG SULTAN KUDARAT17MH0062 · ₱5,423,301.60 · mapped
- CONSTRUCTION OF HANGING BRIDGE PHASE 1 AT BRGY. KALAMONGOG, LEBAK, SULTAN KUDARAT23MH0076 · ₱5,419,910.46 · mapped
- RECONSTRUCTION TO CONCRETE PAVEMENT - AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI RD - K1940+320 - K1940+40425MH0001 · ₱5,270,524.32 · mapped
- CONSTRUCTION OF ONE (1) STOREY - FOUR (4) CLASSROOMS SCHOOL BUILDING AT BALUAN SENIOR HIGH SCHOOL PALIMBANG, SULTAN KUDARAT17MH0243 · ₱5,206,087.22 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION I, LEBAK, SULTAN KUDARAT22MH0047 · ₱4,950,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY PURIKAY, LEBAK, SULTAN KUDARAT22MH0051 · ₱4,950,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MASIAG, BAGUMBAYAN, SULTAN KUDARAT22MH0046 · ₱4,950,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SALANGSANG, LEBAK, SULTAN KUDARAT22MH0055 · ₱4,950,000.00 · mapped
- Construction of Flood Control, Brgy. Tran, Lebak, Sultan Kudarat23MH0080 · ₱4,950,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. AURELIO F. FREIRES SR. (POBLACION II), LEBAK, SULTAN KUDARAT22MH0070 · ₱4,950,000.00 · mapped
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
