CONSTRUCTION OF RIVERBANK PROTECTION/FLOOD CONTROL AT ALA RIVER, BARANGAY SALABACA, ESPERANZA, SULTAN KUDARAT
CONSTRUCTION OF RIVERBANK PROTECTION/FLOOD CONTROL AT ALA RIVER, BARANGAY SALABACA, ESPERANZA, SULTAN KUDARAT is a DPWH-tracked public work in Sultan Kudarat 2nd DEO, Region XII. Reported contract value: ₱123,188,760.58. Status: Past target date (DPWH On-Going). Contractor on record: ST TIMOTHY CONST CORP REVOKED 39196. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost



