WOODRIDGE BUILDERS CONST is listed as a company organization in Philippine public procurement records on this site, with 66 linked DPWH project(s) totaling about ₱1,197,391,726.13. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
WOODRIDGE BUILDERS CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 66
- Total value
- ₱1,197,391,726.13
- Published flags
- 0
- Region
- Sultan Kudarat 2nd DEO · Region XII
Online presence
Google Maps: Woodridge Builders Construction and SuppliesGoogle Maps, 2026-10-22
PGFC+5H5, Esperanza, Sultan Kudarat
Public Record Grade
A transparent, data-derived summary of reported public records for WOODRIDGE BUILDERS CONST — not an accusation or finding of wrongdoing.
Score: 80.20 / 100 · Projects in sample: 66 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 65.6/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 65.6
- lateCompletedProjects
- 40
- onTimeCompletedProjects
- 22
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 63
- pastTargetOngoingProjects
- 1
- undatedCompletedProjectsExcluded
- 3
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 66
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 66
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 66
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 66
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 49 of 65 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONSTRUCTION OF CONCRETE ROAD - BRGY. BASAK-VILLAMONTE-CAPILAN CONNECTING TO NEW CALINOG IN SUPPORT OF BAMBOO AND COFFEE PLANTATION, STA. 6+307 - STA. 9+407, LEBAK, SULTAN KUDARAT23M00088 · ₱130,805,573.58 · mapped
- DULAWAN-MARBEL RD - K1742 + (-599) - K1742 + (-335), K1742 + (-260) - K1744 + 380, PINGUIAMAN, LAMBAYONG, SULTAN KUDARAT24MF0003 · ₱123,962,301.14 · mapped
- ROAD WIDENING- KIDAPAWAN ALLAH JUNCTION ROAD, K1677+872-K1678+397, K1678+625-K1679+359, TACURONG CITY.22M00075 · ₱106,147,107.48 · mapped
- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - TUKA-BAI SARIPINANG ROAD IN BAGUMBAYAN SK IN SUPPORT OF AGRI-BASED INDUSTRIES: PINEAPPLE, COFFEE, RUBBER, CORN AND MUSCOVADO PROCESSING PLANT, ROAD: STA. 11+360 -23M00091 · ₱101,224,930.44 · mapped
- CONSTRUCTION OF CONCRETE ROAD - SUBEN-MANGELEN-MANGILALA-ESTRELLA-PANANGGILAN ROAD IN SUPPORT OF FISHING AND ALLIED INDUSTRIES IN LAKE BULUAN (LUTAYAN PORTION) EXTENDING SUPPORT TO MUSCOVADO, PALM OIL, BANANA, CASSAVA AND COCONUT INDUSTRIES, STA. 6+800-ST22M00078 · ₱99,392,862.26 · mapped
- REPLACEMENT OF PERMANENT WEAK BRIDGES - LIMULAN BR. (B00628MN) ALONG AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI RD23MH0012 · ₱96,499,985.39 · mapped
- NRJ POBLACION PRESIDENT QUIRINO CONNECTING TO BRGY. BAGUMBAYAN IN SUPPORT OF PALM OIL, MUSCOVADO/SUGARCANE, VEGETABLES, RICE AND CORN, PRESIDENT QUIRINO, SULTAN KUDARAT23MF0020 · ₱48,972,517.80 · mapped
- KIDAPAWAN-ALLAH JUNCTION RD - K1672 + 506 - K1672 + 93824MF0001 · ₱48,345,016.84 · mapped
- CONSTRUCTION OF CONNECTING TAXIWAY, TAMBLER, PHASE II, GENERAL SANTOS CITY, SOUTH COTABATO25M00047 · ₱43,414,655.55
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (NEW BUILDING FOR PROVINCIAL HOSPITAL) BRGY. SAMPAO, ISULAN, SULTAN KUDARAT24MF0068 · ₱29,673,844.22 · mapped
- CONSTRUCTION ROAD, BARANGAY SALABACA TO BARANGAY DALADAP (PHASE 1), ESPERANZA, SULTAN KUDARAT24MH0093 · ₱29,379,046.60 · mapped
- CONSTRUCTION OF RIVER BANK PROTECTION/FLOOD CONTROL AT LIMULAN RIVER (DOWNSTREAM),KALAMANSIG, SULTAN KUDARAT KALAMANSIG, SULTAN KUDARAT20MH0023 · ₱28,224,000.00 · mapped
- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES -JCT NHW BIWANG-DAGUMA-KAPAYA TO JCT. NHW-NAKAN ROAD IN SUPPORT TO BANANA, RICE, CORN, COCONUT, MONGGO, POULTRY/EGGS AND PIGGERY, STA.0+000 - STA. 0+700, BAGUMBAYAN24M00207 · ₱24,069,003.74 · mapped
- CONSTRUCTION OF MULTIPURPOSE BUILDING (MUNICIPAL LEGISLATIVE BUILDING) IN BARANGAY POBLACION, LUTAYAN, SULTAN KUDARAT23MF0053 · ₱19,776,930.77 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT PROVINCIAL GOVERNMENT SITE, BRGY. KALAWAG II, ISULAN, SULTAN KUDARAT22MF0060 · ₱19,735,673.83 · mapped
- WIDENING OF PERMANENT BRIDGE - BARURAO BRIDGE (B00622MN) ALONG AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI ROAD LEBAK, SULTAN KUDARAT19MH0013 · ₱19,368,456.00 · mapped
- WIDENING OF PERMANENT BRIDGES - KAWA BRIDGE 2 (B01541MN) ALONG SEN. NINOY AQUINO-LEBAK-KALAMANSIG ROAD SEN. NINOY AQUINO, SULTAN KUDARAT19MH0016 · ₱19,024,178.60 · mapped
- CONSTRUCTION OF BOX CULVERT (DOUBLE BARREL), SEG. 1: 0+000 - STA. 0+006, SEG. 2: STA. 0+361 - STA. 0+367, BARANGAY SAN MATEO, ALEOSAN, COTABATO24M00062 · ₱14,749,890.66 · mapped
- WIDENING OF PERMANENT BRIDGES - PILANDOK BRIDGE (B00621MN) ALONG AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI ROAD19MH0020 · ₱14,673,456.00 · mapped
- WIDENING OF PERMANENT BRIDGE, MASUROT BRIDGE (B00623MN) ALONG AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI ROAD LEBAK, SULTAN KUDARAT19MH0018 · ₱11,912,175.65 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, COR. PANES/DAPITAN ST., KALAWAG 1, ISULAN, SULTAN KUDARAT23MF0038 · ₱9,879,654.84 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (WITHIN THE NARRA PARK COMPOUND), ISULAN, SULTAN KUDARAT24MF0066 · ₱9,871,179.05 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, TACURONG, SULTAN KUDARAT22MF0062 · ₱9,847,082.21 · mapped
- CONSTRUCTION OF ROAD, PUROK SAN GREGORIO, BARANGAY BLINGKONG, LUTAYAN, SULTAN KUDARAT23MF0027 · ₱9,818,546.27 · mapped
- IMPROVEMENT OF INTERSECTION - KIDAPAWAN-ALLAH JUNCTION RD (S00747MN) - K1673 + 581 AND BUENAFLOR, TACURONG CITY, SULTAN KUDARAT24MF0013 · ₱9,765,003.09 · mapped
- OLYMPIC POOL MULTI PURPOSE BUILDING, OLD CAPITOL, KALAWAG 2, ISULAN, SULTAN KUDARAT23MF0082 · ₱9,598,830.65 · mapped
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - PANGAWAN BRIDGE 3 (B01265MN) ALONG AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI ROAD LEBAK, SULTAN KUDARAT19MH0019 · ₱8,960,760.00 · mapped
- CONSTRUCTION OF JUNCTION NATIONAL HI-WAY, BARANGAY LAGUINDING ROAD, BRGY. LAGUINDING, ESPERANZA, SULTAN KUDARAT22MH0063 · ₱8,801,098.20 · mapped
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - BUSAWON BRIDGE 1 (B00630MN) ALONG AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI ROAD KALAMANSIG, SULTAN KUDARAT19MH0014 · ₱7,885,668.80 · mapped
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - KALAMANSIG BRIDGE (B00629MN) ALONG AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI ROAD KALAMANSIG, SULTAN KUDARAT19MH0015 · ₱6,702,644.00 · mapped
- BLISS TO MAMALI ROAD CONNECTING TO BANANA PROCESSING AND MANUFACTURING PLANT, LUTAYAN, SULTAN KUDARAT23MF0018 · ₱5,692,289.25 · mapped
- CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING, KALAWAG CENTRAL ELEMENTARY SCHOOL, BRGY. KALAWAG 2, ISULAN, SULTAN KUDARAT24MF0053 · ₱4,967,196.89 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (MINI- GYM), KALAWAG CENTRAL SCHOOL, BARAGAY KALAWAG 1, ISULAN, SULTAN KUDARAT23MF0040 · ₱4,944,700.77 · mapped
- CONSTRUCTION OF BARANGAY TAMNAG MULTI-PURPOSE BUILDING, BARANGAY TAMNAG, LUTAYAN, SULTAN KUDARAT22MF0058 · ₱4,939,455.52 · mapped
- ROAD CONCRETING OF BARANGAY ANTONG BOUNDARY MUNICIPALITY OF TANTANGAN, SOUTH COTABATO TO BARANGAY SAMPAO LUTAYAN22MF0051 · ₱4,933,939.86 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (PASALUBONG CENTER), BARANGAY LAGUINDING, ESPERANZA, SULTAN KUDARAT21MH0106 · ₱4,553,460.28 · mapped
- SKATE PARK MULTI PURPOSE BUILDING, OLD CAPITOL, KALAWAG 2, ISULAN, SULTAN KUDARAT23MF0084 · ₱3,809,374.32 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY NEW PANAY, ESPERANZA, SULTAN KUDARAT25MH0053 · ₱2,956,889.52 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION, ESPERANZA, SULTAN KUDARAT25MH0056 · ₱2,880,603.00 · mapped
- SANGGUNIANG KABATAAN MULTI PURPOSE BUILDING MINI GARDEN PARK, OLD CAPITOL, KALAWAG 2, ISULAN, SULTAN KUDARAT23MF0083 · ₱2,846,183.79 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (GYMNASIUM), BARANGAY NUMO, ESPERANZA, SULTAN KUDARAT25MH0054 · ₱2,706,806.94 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY LAGUINDING, ESPERANZA, SULTAN KUDARAT24MH0063 · ₱2,474,997.71 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY BANALI, SENATOR NINOY AQUINO, SULTAN KUDARAT24MH0056 · ₱2,424,949.37 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (GYMNASIUM), BARANGAY MAGSAYSAY, ESPERANZA, SULTAN KUDARAT24MH0038 · ₱1,979,993.42 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYMNASIUM) BRGY. BASAG, SEN. NINOY AQUINO, SULTAN KUDARAT19MH0033 · ₱1,975,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY. BUGSO, SEN. NINOY AQUINO, SULTAN KUDARAT19MH0072 · ₱1,975,000.00 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (GYMNASIUM), BARANGAY DUKAY, ESPERANZA, SULTAN KUDARAT25MH0050 · ₱1,963,811.83 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL) BRGY. POBLACION, ESPERANZA, SULTAN KUDARAT19MH0107 · ₱995,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (DAY CARE CENTER) BRGY. KANULAY, BAGUMBAYAN, SULTAN KUDARAT19MH0031 · ₱995,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (DAY CARE CENTER) BRGY. KANGKONG, ESPERANZA, SULTAN KUDARAT19MH0116 · ₱995,000.00 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →