Construction of Flood Control Structure, Ala River Road Dike, Package A - Phase 4, Lambayong, Sultan Kudarat
Construction of Flood Control Structure, Ala River Road Dike, Package A - Phase 4, Lambayong, Sultan Kudarat is a DPWH-tracked public work in LAMBAYONG (MARIANO MARCOS) (SULTAN KUDARAT), SULTAN KUDARAT, Region XII. Reported contract value: ₱106,044,862.40. Status: Reported complete (DPWH). Contractor on record: VICENTE T LAO CONST. Figures trace to sumbong.
Total Contract Cost

