Flood Control and Drainage24K00241

CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ODIONGAN RIVER, PACKAGE 3, GINGOOG CITY, MISAMIS ORIENTAL

CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ODIONGAN RIVER, PACKAGE 3, GINGOOG CITY, MISAMIS ORIENTAL is a DPWH-tracked public work in Region X, Region X. Reported contract value: ₱286,305,436.02. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: VICENTE T LAO CONST. Figures trace to dpwh.

Region X, Region X
Region: Region X

Follow the peso

2 of 5 steps linked from public records. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    Not yet linked

  2. 2. SARO / NCA release

    Not yet linked

  3. 3. PhilGEPS award

    ₱286,305,436 · VICENTE T. LAO CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2024-04-25 → 2026-03-23

    Same record (DPWH contract ID)

    DPWH source ↗
  5. 5. COA audit finding

    Not yet linked

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Misamis Oriental

Based on the coordinates published with the DPWH record and NOAH file MisamisOriental.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ODIONGAN RIVER, PACKAGE 3, GINGOOG CITY, MISAMIS ORIENTAL

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2024 GAA. DBM GAA FY2024

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

Confirmed (exact contract ID) · 100%

24K00241

₱286,305,436.02 · VICENTE T. LAO CONSTRUCTION

Award / contract ref: 24K00241

Contractor

C

407 projects · ₱34.7B total · 2 flags

4. Implementation

Contract Amount

₱286,305,436.02

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

June 6, 2024

Target End

June 30, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.