Construction of Ransang River Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 300 R/S Upstream, Barangay Ransang, Rizal, Palawan
Construction of Ransang River Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 300 R/S Upstream, Barangay Ransang, Rizal, Palawan is a DPWH-tracked public work in RIZAL (MARCOS) (PALAWAN), PALAWAN, Region IV-B. Reported contract value: ₱24,499,994.74. Status: Reported complete (DPWH). Contractor on record: L&M RODRIGUEZ CONST AND TRADING INC FORMERLY: M M RODRIGUEZ TRADING AND CONST. Figures trace to sumbong.
Total Contract Cost
