Flood Control and Drainage18KE0043

CONSTRUCTION OF RUBBLE CONCRETE DIKE ALONG BALBAGON 1 RIVER CONTROL/DRAINAGE SYSTEM ALONG CCR

CONSTRUCTION OF RUBBLE CONCRETE DIKE ALONG BALBAGON 1 RIVER CONTROL/DRAINAGE SYSTEM ALONG CCR is a DPWH-tracked public work in Camiguin DEO, Region X. Reported contract value: ₱25,136,976.08. Status: Reported complete (DPWH). Contractor on record: JAPUZ-JANSOL ENT. Figures trace to dpwh.

Camiguin DEO, Region X
Region: Region X

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2018 · ₱27,000

    Probable match · score 0.91

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-BMB-B-18-0020242 · ₱136,884 · release to the district office, not itemized per project

    Possible match · score 0.78

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱25,136,976 · JAPUZ - JANSOL ENTERPRISES

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-01-20 → 2019-11-21

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Low flood hazard · Camiguin

Based on the coordinates published with the DPWH record and NOAH file Camiguin.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF RUBBLE CONCRETE DIKE ALONG BALBAGON 1 RIVER CONTROL/DRAINAGE SYSTEM ALONG CCR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 91%

UACS
18001
Amount
₱27,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Rubble Concrete Dike along Balbagon I River Control/Drainage System along CCR, Balbagon Bridge I, Mambajao, Camiguin
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-B-18-0020242

₱136,884.00 · FY2018

Released to Central Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱25,136,976.08

Progress

Reported complete (DPWH)

Start Date

April 10, 2018

Target End

August 15, 2018

5. Audit